BP113055 - 1250 Island Highway -- Scanned

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP113055 - 1250 Island Highway -- Scanned
Neighbourhood: Chase River    
Street Address: 1250 Island Highway -- Scanned
Type of Application: Commercial / Multi / Industrial
File Number: BP113055
Date Application Submitted: June 25, 2008
Application Description: Rona, 3,893m2, prefabricated steel building, retail/warehouse plus 210.7m2 attached greenhouse and office space on 355m2 enclosed non-combustible mezzanine floor. Alternative Solutions for the spatial separation construction requirements of the East building face by LMDG.

Building Classification: 2006BCBC 3.2.2.60, Group E, one storey, sprinklered with fire alarm, 3/4 hr FRR floor assemblies, mezzanine & supports if of combustible construction.
March 2,09 Sprinkler design & Schedule B1, B2 from M.W. Demidow submited. VS
Apr 21, 09 Alternative Solution report, Structural & Architectural design, Schedules submitted for racking system with mezzanine floor.
Application Status: COMPLETED
Permit Value: $3,440,000.00
Issued Date: December 09, 2008
File Close Date: August 31, 2009

Associated Properties

Address Zone More
1250 ISLAND HIGHWAY S CC3 Property Report

Process Steps

Task Status
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PARTIAL
MONITORING FIELD REVIEW

A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional.

PARTIAL
MONITORING FIELD REVIEW

A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional.

CANCELLED
MONITORING FIELD REVIEW

A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional.

CANCELLED
MONITORING FIELD REVIEW

A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional.

FAILED
MONITORING FIELD REVIEW

A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional.

FAILED
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

PASSED
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

PARTIAL
PLUMBING FINAL-OLD

All fixtures must be in place.

PARTIAL
PLUMBING FINAL-OLD

All fixtures must be in place.

PASSED
OCCUPANCY-OLD FAILED
OCCUPANCY-OLD PASSED

2009-06-16

OCCUPANCY-OLD FAILED
OCCUPANCY-OLD PASSED

2009-08-31

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

Help us improve our website

Don't include private or financial information in this form.

Collection and use of your personal information
Information collected on this form is done so under the general authority of the Community Charter and Freedom of Information and Protection of Privacy Act (FOIPPA), and is protected in accordance with FOIPPA.  Personal information will only be used by authorized staff to fulfill the purpose for which it was originally collected, or for a use consistent with that purpose. Questions about the collection of your personal information may be referred to the Legislative Services Department at (250) 755-4405, or via email at foi@nanaimo.ca.
Privacy Policy