City of Nanaimo Projects

  • Clear Search
Title and Summary Category Status Start Date End date

White Eagle Terrace – Sanitary Sewer Upgrades

The project will include the removal and replacement of an existing 100m long 450mm diameter sanitary sewer main located at end of White Eagle Terrace, along with a 3m paved asphalt trailway from the end of White Eagle Terrace connecting to the remaining walkway down to the foreshore. 
Category:
Active
05/02/2022 08/31/2022

Housing Needs Assessment

Category:
Active
02/01/2022 12/31/2022

Fifth Street Complete Street

The Fifth Street Complete Street project aims to increase the safety and comfort for people who walk, bike, take transit, and drive along this corridor. This project will see the continuation of on-street cycling facilities between the Downtown Mobility Hub and Vancouver Island University Mobility Hub, which is the City's largest cycling destination.
Category: Engineering
Active

Mobility, Accessibility and Safety Improvement Projects

A variety of small-scale mobility, accessibility, and safety improvements around the City.
Category: Transportation
Active
09/01/2018 12/31/2020

Third Street - Utility & Complete Street Upgrades

This projects aim to increase the safety and comfort of pedestrians, cyclists, transit users and motorists while ensuring utility upgrades within the project area are completed in concert with the proposed surface improvements.
Category: Engineering
Active

Albert / Fourth Complete Street  Phase 2

This page provides information about Phase 2 of the Albert/Fourth Complete Streets Project.
Category: Engineering
Active

Albert / Fourth Complete Street Phase 1

This project will see the continuation of on-street cycling facilities, and improvements to pedestrian and transit facilities, between VIU and Downtown.  This connection provides the shortest and most direct route between the Downtown Mobility Hub and Vancouver Island University Mobility Hub, which is the City's largest cycling destination. This cycling route is also referred to as the VIU Bikeway.
Category: Engineering
Active

Nanaimo Operations Centre Project

Category: Facilities
Active

Adaptable and Accessible Housing Policy

This page provides information about the policy project intended to encourage more adaptable and accessible housing units within the City of Nanaimo.  Adaptable and Accessible housing refers to housing that accommodates all residents regardless of their abilities.  An Accessible dwelling is designed to meet the needs of people with all abilities; an Adaptable dwelling is designed to be easily renovated to meet tenant or owner's changing accessibility needs.


Category:
Active
08/26/2021 01/01/2022

Family Friendly Housing Policy

This page provides information about the policy project intended to encourage more multiple family friendly housing units within the City of Nanaimo.


Category:
Active
08/26/2021 01/01/2022

Terminal Avenue Upgrades

Category: Engineering
Active

Mid-Town Water Supply Upgrades

The proposed large diameter water supply transmission mains will deliver potable treated water from the College Heights Reservoirs to the Labieux Road pump station.

Category: Engineering
Active
03/12/2021

Bowen Park Creatures Art Project

This art project explores and celebrates Bowen Park, inviting curiosity about the life and relationships in the park– plant, animal, and human. 
Category: Arts and Culture
Active

The Georgia Greenway (Phase 2)

Phase 1 of the Georgia Greenway project was completed in 2019. Phase 2 of the project is now underway. Phase 2 will extend the Georgia Greenway from Fourth Street to Eighth Street by introducing several "Slow Street" measures including a reduced speed limit, traffic calming features, and cycling improvements. 
Category: Transportation
Active
07/01/2020 02/26/2021

Lost Lake Road Traffic Calming

Category: Transportation
Active
05/04/2020 12/31/2022

REIMAGINE NANAIMO

REIMAGINE NANAIMO is a comprehensive engagement process to reimagine Nanaimo's next 20 years that will support the creation of several guiding plans through one streamlined engagement process. The process is intended to understand what matters most to the Nanaimo community and use these insights to set a future destination.

Category: Planning
Active

Protection Island to Maffeo Sutton Park Submarine Cable Replacement (BC HYDRO)

Since 1969, BC Hydro has been supplying electricity to customers on Protection Island. Currently customers are served by a submarine cable from Nanaimo to Newcastle Island and Newcastle Island to Protection. The existing cables serving Protection Island are nearing end of life.

 

Project

The Protection Island Submarine Cable Replacement Project has been initiated to ensure long-term reliable supply of power to Protection Island. Upon project completion, Protection Island will be supplied with electricity from two new submarine cables in McKay Channel, beginning near Maffeo Sutton Park in Nanaimo and terminating near Pirates Park on Protection Island.

Category:
Active
03/15/2020 04/03/2020

Harewood Centennial Playground Improvements

In 2010, City Council adopted an improvement plan for Harewood Centennial Park to ensure that the outdated park amenities were improved to meet the recreational needs and desires of the changing community
Category: Parks
Active

BC Energy Step Code Implementation Strategy

As part of the City's efforts to take action against Climate Change, the B.C. Energy Step Code Implementation Strategy was adopted by Council in July 2018. An amendment to the City's Building Bylaw was adopted in October 2019 that will require a phased implementation of the Step Code.
Category:
Active

Fire Station #1 Replacement

The City of Nanaimo is planning to replace the existing Fire Station #1 at the corner Milton and Fitzwillaim Street with a new one. The new station will house Fire and Rescue Command, Fire Dispatch, Office and Administration / Business Centre and the City of Nanaimo's Emergency Coordination Centre.
Category:
Active

Downtown Mobility Hub Project

Category: Transportation
Active
02/15/2019 10/30/2020

Reducing Single Use Checkout Bags in Nanaimo

The City of Nanaimo is dedicated to taking a leadership role to protect our natural environment and municipal infrastructure.

Checkout Bag Regulation Bylaw 2020 No. 7283 was adopted by Council on February 22, 2021, and was implemented on July 1, 2021. The Bylaw encourages the use of reusable bags by eliminating use of plastic bags and regulating the distribution of new reusable bags and paper bags.

Category:
Active

Metral Drive Complete Street

The plan will include a streetscape vision, improvements to pedestrian, bicycle, and transit facilities, green/sustainable roadway and landscape improvements, and transportation improvements to meet the needs of existing and future users of the corridor.
Category: Engineering
Active
09/01/2018 08/31/2022

Midtown Gateway Project

The Mid-Town Gateway project (formerly the Boxwood Connector project) will ease traffic congestion at the intersection of Bowen Road and Northfield Road by diverting traffic and enhancing vehicle circulation. The proposed roadways will support walking, cycling and transit through the use of complete streets principles.
Category:
Active

Te'tuxwtun Project (Fifth Street Properties)

The purpose of the Te’tuxwtun Project is for the Knowledge Partners to explore opportunities for joint development and partnership on all three properties. It is the Knowledge Partners’ intention to enhance the community through housing, services and amenities. The Te’tuxwtun Project, built on the teachings of the land, is envisioned to provide the foundation to both protect and improve the quality of life for all present and future community members.

Priorities for the project include:

  • New affordable rental housing
  • A new location for the Learning Alternatives school district program
  • Culture, parks and recreation services
  • Other community services identified through the planning process, such as health services and childcare

Snuneymuxw First Nation will guide the growth and development of the three properties, bringing a wealth of cultural knowledge to the project. 

Category:
Active
12/17/2018 03/31/2022

Home-Based Business Regulation Review

The City of Nanaimo is in the process of updating the home-based business regulations in Zoning Bylaw 4500. The update is intended to modernize the regulations to support home-based businesses while balancing the needs of the neighbourhoods in which they operate.
Category:
Active

East Wellington Park Planning

The City of Nanaimo would like to hear your comments on the draft East Wellington Park Management and Action Plan. Visit the project webpage to review the draft plan and for information on upcoming events including an open house and park visit.
Category: Parks
Active

Linley Valley Park Planning

With the addition of 20.2 hectares (50 acres) added in May 2018 located off of Tanya Drive, a planning process for Linley Valley Park will be undertaken.
Category: Parks
Active

South Downtown Waterfront - 1 Port Drive

The City of Nanaimo acquired the lands at 1 Port Drive from CP Rail in March 2013
Category: Planning
Active

100 Gordon Street

100 Gordon Street was a City-owned property, in downtown Nanaimo
Category: Planning
Active

Heritage Conservation Program - Update and Review

We are reviewing our current Heritage Conservation Program to ensure that the priorities and partners are still relevant, and determine how we can work better with our partners and the community to conserve Nanaimo's heritage.
Category: Heritage
Active
01/01/2015

Nanaimo Waterfront Walkway

In December 2017, Nanaimo City Council endorsed the Nanaimo Waterfront Walkway Implementation Plan which outlines how the waterfront walkway can be upgraded and expanded from Departure Bay to the Nanaimo River Estuary.

Category: Engineering
Active
05/17/2017

Estevan Road and Princess Royal Avenue Street Improvements

The City of Nanaimo is planning improvements to the transportation network of the Brechin Hill area. Specifically, Estevan Road and Princess Royal Avenue will see a variety of improvements from Brechin Road to Terminal Avenue occurring in two phases.
Category: Engineering
Active

Beban Park Master Plan Update

In 2015, a master plan update process was completed to ensure that this park campus meets the current and future recreational needs of the community
Category: Parks
Active

Harewood Centennial Park Improvements

In 2010, City Council adopted an improvement plan for Harewood Centennial Park to ensure that the outdated park amenities were improved to meet the recreational needs and desires of the changing community
Category: Parks
Active

Maffeo Sutton Park Master Plan Update

The City of Nanaimo is working to further improve Maffeo Sutton Park.
Category: Parks
Active
06/21/2015

Last updated: August 9, 2021

Help us improve our website

Don't include private or financial information in this form.

Collection and use of your personal information

Information collected on this form is done so under the general authority of the Community Charter and Freedom of Information and Protection of Privacy Act (FOIPPA), and is protected in accordance with FOIPPA. Questions about the collection of your personal information may be referred to the Legislative Services Department at 250-755-4405, or via email at foi@nanaimo.ca. Please also see our Privacy Policy.