BP118134 - 80 White Eagle Terrace
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP118134 - 80 White Eagle Terrace | |
|---|---|
| Neighbourhood: | Departure Bay | 
| Street Address: | 80 White Eagle Terrace | 
| Type of Application: | Garage / Carport Permit | 
| File Number: | BP118134 | 
| Date Application Submitted: | December 14, 2012 | 
| Application Description: | Remove existing garage and replace with new double garage and storage area with sundeck above which connects to back deck. All new footings and garage slab. | 
| Application Status: | COMPLETED | 
| Permit Value: | $30,000.00 | 
| Issued Date: | August 06, 2013 | 
| File Close Date: | September 09, 2015 | 
| Expiry Date: | August 06, 2015 | 
Associated Properties
| Address | Zone | More | 
|---|---|---|
| 80 WHITE EAGLE TERRACE | R5 | Property Report | 
Process Steps
| Task | Status | 
|---|---|
| LATERAL BRACING & SHEATHING All nailing and blocking associated with braced wall panels to be completed for this inspection. Wood-based interior braced wall panels to be sheathed. Exterior braced wall panel locations to be clearly marked out on the interior and exterior. Interior braced wall panels to be clearly marked so their location can be seen now and later at the time of INTERIOR BRACED WALL PANEL INSPECTION. Additional anchor bolts shall be installed two per braced wall panel where a building contains framed walls supporting more than two floors. | COMPLETED | 
| FOOTING/FORMS Inspection of forms prior to any cement being poured . For footing inspection, forms must be complete and approved plans (complete with City Stamp) must be onsite. | FAILED | 
| FOOTING/FORMS Inspection of forms prior to any cement being poured . For footing inspection, forms must be complete and approved plans (complete with City Stamp) must be onsite. | PASSED | 
| MONITORING FIELD REVIEW | PASSED | 
| PERIMETER DRAIN For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. | PASSED | 
| PAPER/FLASHING/WATERPROOFING When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. | PARTIAL | 
| PAPER/FLASHING/WATERPROOFING When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. | FAILED | 
| PAPER/FLASHING/WATERPROOFING When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. | PASSED | 
| FRAMING Rough-in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. | PASSED | 
| FINAL-OLD Final Approval as per requested on plans. | FAILED | 
| FINAL-OLD Final Approval as per requested on plans. | PASSED 2015-09-09 | 
| Map | 
|---|
|  View in Google Earth (KML) | 
            
            Disclaimer:
            
            The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
            Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
            The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
            
            The Information Provided within this website is for Informational Purposes Only.
            It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.
            
        