BP123690 - 238 Franklyn Street

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP123690 - 238 Franklyn Street
Neighbourhood: Downtown/Old City    
Street Address: 238 Franklyn Street
Type of Application: Commercial / Multi / Industrial
File Number: BP123690
Date Application Submitted: September 19, 2017
Application Description: Construction of 5-storey, 46 unit mixed use building including three accessible units. The building will also have three CRU shells. Building classification (superimposed occupancies) 3.2.2.50, Group C, up to 6 storeys,sprinklered. 3.2.2.56 Group D, up to 6 storeys, sprinklered. 3.2.2.62 Group E, Any height, any area, sprinklered. 3.2.2.80, Group F3, up to 6 storeys, sprinklered. Fire alarm system. Storage garage separated by 2hr FS/FRR from adjacent occupancies. Floors(E to C), elevator shafts and exit stairs at 1st and 2nd storey 2hr FS/FRR. Floors, elevator shafts and exit stairs floors 3-5 have 1hr FS/FRR. Separation between adjacent residential suites and corridors 1hr FS/FRR. Mezzanine floor 1hr FRR. Alternative solution to address the over sized building area and construction requirements for 5 storey Group C occupancy and for combustible timber frame beams within a non-combustible constriction area by GHL Consultants Ltd.
Application Status: ACTIVE
Permit Value: $9,500,000.00
Builder: BILL DERBY
Builder: TECTONICA MANAGEMENT INC
Issued Date: November 23, 2017
Expiry Date: November 23, 2019

Process Steps

Task Status
FOOTING/FORMS

Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PARTIAL
FOOTING/FORMS

Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PARTIAL
FOOTING/FORMS

Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PARTIAL
FOOTING/FORMS

Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PARTIAL
FOOTING/FORMS

Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PARTIAL
FOOTING/FORMS

Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PARTIAL
FOOTING/FORMS

Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PARTIAL
FOOTING/FORMS

Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PARTIAL
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

CANCELLED
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PARTIAL
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PARTIAL
UNDERSLAB PLUMBING

complete underslab plumbing must be visable.

PARTIAL
UNDERSLAB PLUMBING

complete underslab plumbing must be visable.

PARTIAL
UNDERSLAB PLUMBING

complete underslab plumbing must be visable.

PARTIAL
UNDERSLAB PLUMBING

complete underslab plumbing must be visable.

PARTIAL
UNDERSLAB PLUMBING

complete underslab plumbing must be visable.

PARTIAL
UNDERSLAB PLUMBING

complete underslab plumbing must be visable.

FAILED
UNDERSLAB PLUMBING

complete underslab plumbing must be visable.

SCHEDULED
UNDERSLAB PLUMBING

complete underslab plumbing must be visable.

PARTIAL
STORM CONNECTION

Pipe and connection must be visible for inspection.

PARTIAL
STORM CONNECTION

Pipe and connection must be visible for inspection.

PARTIAL
STORM CONNECTION

Pipe and connection must be visible for inspection.

PARTIAL
SANITARY CONNECTION

Pipe and connection must be visible for inspection.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

FAILED
Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

Help us improve our website

Don't include private or financial information in this form.