BP129732 - 853 Quilchena Crescent
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP129732 - 853 Quilchena Crescent | |
---|---|
Neighbourhood: | Departure Bay |
Street Address: | 853 Quilchena Crescent |
Type of Application: | Single / Two Family Alteration |
File Number: | BP129732 |
Date Application Submitted: | February 01, 2024 |
Application Description: |
Interior renovations of entire dwelling, including second-floor addition and new secondary suite in basement. 2024-MAY-29 REVISION: Revised structural drawings. Geotechnical Engineer and Schedule B added. 2024-AUG-20 REVISION: Interior and exterior revisions including: 1. Lower floor footprint increased towards rear yard at utility room / rear deck and towards front yard at 2-car garage/ office. 2. Lower floor layout revised, including increase of floor area to secondary suite, changes to principal bathroom, laundry and mudroom entry, window / door sizes and locations. 3. Secondary suite ground floor plan and roof above removed from right side yard and increased in depth at front yard. 4. Upper floor layout revised, including increase in building area and layout change at ensuite washroom, window sizes and locations. 5. Front second storey balcony reduced in width and new roof at kitchen. |
Application Status: | ACTIVE |
Permit Value: | $200,000.00 |
Builder: | DOWNS CONSTRUCTION LTD |
Issued Date: | March 07, 2024 |
Expiry Date: | March 07, 2026 |
Associated Properties
Address | Zone | More |
---|---|---|
853 QUILCHENA CRESCENT | R5 | Property Report |
Process Steps
Task | Status |
---|---|
EXCAVATION
Excavation of soil, prior to placing forms. |
FAILED |
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
FAILED |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
PARTIAL |
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
PARTIAL |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.