BP126541 - 820 Dufferin Street
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP126541 - 820 Dufferin Street | |
|---|---|
| Neighbourhood: | Townsite | 
| Street Address: | 820 Dufferin Street | 
| Type of Application: | Single / Two Family Alteration | 
| File Number: | BP126541 | 
| Date Application Submitted: | August 06, 2020 | 
| Application Description: | 1 STOREY ADDITION TO ADD SECONDARY SUITE, SLAB ON GRADE. REVISION 2020-NOV-25: Add frost wall to demising wall, window and door changes. REVISION 2021-JAN-19: Changed braced wall panel, corrected dimensions of existing house | 
| Application Status: | COMPLETED | 
| Permit Value: | $132,316.65 | 
| Building Area: | 73.58 M2 792.01 ft2 | 
| Builder: | SHINING KNIGHT CONSTRUCTION INC | 
| Issued Date: | October 05, 2020 | 
| File Close Date: | April 28, 2021 | 
| Expiry Date: | October 05, 2022 | 
Associated Properties
| Address | Zone | More | 
|---|---|---|
| 820 DUFFERIN STREET | R5 | Property Report | 
Process Steps
| Task | Status | 
|---|---|
| EXCAVATION Excavation of soil, prior to placing forms. | PASSED | 
| EXCAVATION Excavation of soil, prior to placing forms. | PASSED | 
| FOOTING/FORMS Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. | PARTIAL | 
| FOOTING/FORMS Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. | FAILED | 
| FOOTING/FORMS Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. | PASSED | 
| PERIMETER DRAIN For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. | PARTIAL | 
| PERIMETER DRAIN For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. | PARTIAL | 
| PERIMETER DRAIN For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. | CANCELLED | 
| PERIMETER DRAIN For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. | PASSED | 
| UNDERSLAB PLUMBING Complete underslab plumbing must be visible | PARTIAL | 
| UNDERSLAB PLUMBING Complete underslab plumbing must be visible | PASSED | 
| UNDERSLAB INSULATION Inspection required prior to placing slab concrete. | FAILED | 
| UNDERSLAB INSULATION Inspection required prior to placing slab concrete. | PASSED | 
| STORM CONNECTION Pipe and Connection must be visible for inspection | PASSED | 
| SANITARY CONNECTION Pipe and Connection must be visible for inspection | PASSED | 
| ROUGH IN PLUMBING Rough In plumbing must be complete including water piping. | FAILED | 
| PAPER/FLASHING/WATERPROOFING When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. | PARTIAL | 
| ROUGH IN PLUMBING Rough In plumbing must be complete including water piping. | PASSED | 
| PAPER/FLASHING/WATERPROOFING When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. | PASSED | 
| LATERAL BRACING & SHEATHING All nailing and blocking associated with braced wall panels to be completed for this inspection. Wood-based interior braced wall panels to be sheathed. Exterior braced wall panel locations to be clearly marked out on the interior and exterior. Interior braced wall panels to be clearly marked so their location can be seen now and later at the time of INTERIOR BRACED WALL PANEL INSPECTION. Additional anchor bolts shall be installed two per braced wall panel where a building contains framed walls supporting more than two floors. | FAILED | 
| LATERAL BRACING & SHEATHING All nailing and blocking associated with braced wall panels to be completed for this inspection. Wood-based interior braced wall panels to be sheathed. Exterior braced wall panel locations to be clearly marked out on the interior and exterior. Interior braced wall panels to be clearly marked so their location can be seen now and later at the time of INTERIOR BRACED WALL PANEL INSPECTION. Additional anchor bolts shall be installed two per braced wall panel where a building contains framed walls supporting more than two floors. | PASSED | 
| FRAMING Rough in plumbing & electrical must be complete. | FAILED | 
| FRAMING Rough in plumbing & electrical must be complete. | CANCELLED | 
| FRAMING Rough in plumbing & electrical must be complete. | CANCELLED | 
| FRAMING Rough in plumbing & electrical must be complete. | PASSED | 
| INSULATION Insulation and vapour barrier to be complete prior to inspection | FAILED | 
| INSULATION Insulation and vapour barrier to be complete prior to inspection | PASSED | 
| INTERIOR BRACED WALL PANELS The location of interior braced wall panels to be clearly indicated. This inspection is to take place prior to the installation of tape and joint compound. | FAILED | 
| INTERIOR BRACED WALL PANELS The location of interior braced wall panels to be clearly indicated. This inspection is to take place prior to the installation of tape and joint compound. | PASSED | 
| FINAL Final approval as per requirements on plans. | PASSED 2021-04-28 | 
| Map | 
|---|
|  View in Google Earth (KML) | 
            
            Disclaimer:
            
            The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
            Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
            The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
            
            The Information Provided within this website is for Informational Purposes Only.
            It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.
            
        