BP125554 - 6037 Linley Valley Drive (BLDG 3)
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP125554 - 6037 Linley Valley Drive (BLDG 3) | |
|---|---|
| Neighbourhood: | Rutherford | 
| Street Address: | 6037 Linley Valley Drive (BLDG 3) | 
| Type of Application: | Commercial / Multi / Industrial | 
| File Number: | BP125554 | 
| Date Application Submitted: | May 28, 2019 | 
| Application Description: | FOR INSPECTIONS ONLY 6037 Linley Valley Dr. Bldg. 3 , (divided by 2hr firewall into two separate buildings), (111 Units) Bldg. A - Area = 1726 m2; Bldg. B - Area - 884 m2. Total GFA = 10,144 m2 All Parkade inspections for Footings and Perimeter Drains are booked under this BP. | 
| Application Status: | COMPLETED | 
| Builder: | NPR GP INC | 
| Issued Date: | December 31, 2019 | 
| File Close Date: | March 17, 2021 | 
| Expiry Date: | December 30, 2021 | 
Process Steps
| Task | Status | 
|---|---|
| FOOTING/FORMS Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. | PARTIAL | 
| FOOTING/FORMS Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. | CANCELLED | 
| FOOTING/FORMS Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. | PARTIAL | 
| FOOTING/FORMS Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. | PARTIAL | 
| FOOTING/FORMS Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. | PARTIAL | 
| FOOTING/FORMS Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. | PARTIAL | 
| FOOTING/FORMS Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. | PARTIAL | 
| FOOTING/FORMS Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. | PARTIAL | 
| FOOTING/FORMS Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. | PARTIAL | 
| FOOTING/FORMS Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. | PARTIAL | 
| FOOTING/FORMS Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. | PASSED | 
| PERIMETER DRAIN For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. | FAILED | 
| PERIMETER DRAIN For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. | PASSED | 
| FIRELINE Fireline for the sprinkler system must be complete and visable for inspection. | PASSED | 
| UNDERSLAB PLUMBING complete underslab plumbing must be visible. | PARTIAL | 
| UNDERSLAB PLUMBING complete underslab plumbing must be visible. | PARTIAL | 
| UNDERSLAB PLUMBING complete underslab plumbing must be visible. | PARTIAL | 
| UNDERSLAB PLUMBING complete underslab plumbing must be visible. | PASSED | 
| STORM CONNECTION Pipe and connection must be visible for inspection. | PASSED | 
| SANITARY CONNECTION Pipe and connection must be visible for inspection. | PASSED | 
| WATER CONNECTION Pipe and connection must be visible for inspection. | PASSED | 
| ROUGH IN PLUMBING Rough in plumbing must be complete including potable water piping. | PARTIAL | 
| ROUGH IN PLUMBING Rough in plumbing must be complete including potable water piping. | PARTIAL | 
| ROUGH IN PLUMBING Rough in plumbing must be complete including potable water piping. | PARTIAL | 
| ROUGH IN PLUMBING Rough in plumbing must be complete including potable water piping. | PASSED | 
| PAPER/FLASHING/WATERPROOFING When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. | PARTIAL | 
| PAPER/FLASHING/WATERPROOFING When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. | PARTIAL | 
| PAPER/FLASHING/WATERPROOFING When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. | PASSED | 
| ROUGH IN SPRINKLER Rough in sprinkler must be complete and visable for inspection. | PASSED | 
| FRAMING Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. | PARTIAL | 
| FRAMING Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. | FAILED | 
| FRAMING Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. | PARTIAL | 
| FRAMING Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. | PARTIAL | 
| FRAMING Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. | PASSED | 
| INSULATION Insulation and vapour barrier to be complete prior to inspection. | CANCELLED | 
| INSULATION Insulation and vapour barrier to be complete prior to inspection. | PARTIAL | 
| INSULATION Insulation and vapour barrier to be complete prior to inspection. | PARTIAL | 
| INSULATION Insulation and vapour barrier to be complete prior to inspection. | PARTIAL | 
| INSULATION Insulation and vapour barrier to be complete prior to inspection. | PARTIAL | 
| INSULATION Insulation and vapour barrier to be complete prior to inspection. | PARTIAL | 
| INSULATION Insulation and vapour barrier to be complete prior to inspection. | PARTIAL | 
| INSULATION Insulation and vapour barrier to be complete prior to inspection. | PARTIAL | 
| INSULATION Insulation and vapour barrier to be complete prior to inspection. | PARTIAL | 
| INSULATION Insulation and vapour barrier to be complete prior to inspection. | PARTIAL | 
| INSULATION Insulation and vapour barrier to be complete prior to inspection. | FAILED | 
| INSULATION Insulation and vapour barrier to be complete prior to inspection. | FAILED | 
| INSULATION Insulation and vapour barrier to be complete prior to inspection. | PARTIAL | 
| INSULATION Insulation and vapour barrier to be complete prior to inspection. | PARTIAL | 
| INSULATION Insulation and vapour barrier to be complete prior to inspection. | PARTIAL | 
| INSULATION Insulation and vapour barrier to be complete prior to inspection. | PARTIAL | 
| INSULATION Insulation and vapour barrier to be complete prior to inspection. | PASSED | 
| SPRINKLER FINAL Sprinkler system must be complete and operating as intended. | FAILED | 
| SPRINKLER FINAL Sprinkler system must be complete and operating as intended. | PASSED | 
| SPRINKLER FINAL Sprinkler system must be complete and operating as intended. | FAILED | 
| PLUMBING FINAL All fixtures must be in place. | FAILED | 
| PLUMBING FINAL All fixtures must be in place. | PASSED | 
| PLUMBING FINAL All fixtures must be in place. | FAILED | 
| APPROVAL-FIRE Approval required prior to Occupancy | APPROVED | 
| APPROVAL-PLANNING Approval required prior to Occupancy | APPROVED | 
| OCCUPANCY | FAILED | 
| OCCUPANCY | CANCELLED | 
| OCCUPANCY | FAILED | 
| OCCUPANCY | PASSED 2021-03-17 | 
| Map | 
|---|
|  View in Google Earth (KML) | 
            
            Disclaimer:
            
            The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
            Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
            The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
            
            The Information Provided within this website is for Informational Purposes Only.
            It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.
            
        