BP125233 - 2 - 1551 Estevan Road

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP125233 - 2 - 1551 Estevan Road
Neighbourhood: Newcastle/Brechin    
Street Address: 2 - 1551 Estevan Road
Type of Application: Commercial / Multi-Res Alteration
File Number: BP125233
Date Application Submitted: February 19, 2019
Application Description: (NAI Commercial Real Estate) Enclose 24.2m2 of exterior space to create lunch room. Addition of kitchen sink and dishwasher.

Existing 2 storey, unsprinklered building, combustible construction, Building classification 3.2.2.58, facing 2 streets. 45 min FRR/FS floor assemblies and 45 min FRR for roof assemblies code building area = approximately 1648m2.

REVISION: May 17/19 - Added urinal to washroom, upgraded cold water lines to 1", construction and FRR changed to the ceiling, wood beam changed to steel beam to remove mid span column and lobby door changed from double leaf to single leaf w/ sidelight.
Application Status: COMPLETED
Permit Value: $75,000.00
Builder: TECTONICA MANAGEMENT INC
Issued Date: May 14, 2019
File Close Date: August 16, 2019
Expiry Date: May 13, 2021

Associated Properties

Address Zone More
1551 ESTEVAN ROAD CC3 Property Report

Process Steps

Task Status
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

PASSED
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

CANCELLED
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PASSED
PLUMBING FINAL-OLD

All fixtures must be in place.

FAILED
PLUMBING FINAL-OLD

All fixtures must be in place.

PASSED
OCCUPANCY-OLD FAILED
OCCUPANCY-OLD CANCELLED
FINAL-OLD

Final approval as per requirements on plans.

PASSED

2019-08-16

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

Help us improve our website

Don't include private or financial information in this form.

Collection and use of your personal information
Information collected on this form is done so under the general authority of the Community Charter and Freedom of Information and Protection of Privacy Act (FOIPPA), and is protected in accordance with FOIPPA.  Personal information will only be used by authorized staff to fulfill the purpose for which it was originally collected, or for a use consistent with that purpose. Questions about the collection of your personal information may be referred to the Legislative Services Department at (250) 755-4405, or via email at foi@nanaimo.ca.
Privacy Policy