BP123804 - 5388/5390 Song Sparrow Way
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP123804 - 5388/5390 Song Sparrow Way | |
|---|---|
| Neighbourhood: | Rutherford | 
| Street Address: | 5388/5390 Song Sparrow Way | 
| Type of Application: | Commercial / Multi / Industrial | 
| File Number: | BP123804 | 
| Date Application Submitted: | October 27, 2017 | 
| Application Description: | (Phase #3) Construction of a  Part 9, two storey duplex, 163.97 m2 per unit, sprinklered and will be constructed over a crawlspace complete with attached garages. 1 hr F/S, FRR to underside of roof sheathing is required between each unit. REVISION: Feb. 4/19 - Revise BWP's in party wall to be offset. Add BWP beside great room and master bedroom. Delete BWP under stair. REVISION: June 6, 2019 - Revise sprinkler layout. REVISION: Nov.1/19 - Change patio's to decks. | 
| Application Status: | COMPLETED | 
| Permit Value: | $500,000.00 | 
| Builder: | SONG'S CONSTRUCTION LTD | 
| Issued Date: | June 19, 2018 | 
| File Close Date: | April 03, 2020 | 
| Expiry Date: | June 19, 2020 | 
Associated Properties
| Address | Zone | More | 
|---|---|---|
| 5390 SONG SPARROW WAY | R8 | Property Report | 
| 5388 SONG SPARROW WAY | R8 | Property Report | 
Process Steps
| Task | Status | 
|---|---|
| FOOTING/FORMS Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. | PASSED | 
| PERIMETER DRAIN For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. | PASSED | 
| UNDERSLAB INSULATION Inspection required prior to placing slab concrete. | FAILED | 
| UNDERSLAB INSULATION Inspection required prior to placing slab concrete. | PASSED | 
| STORM CONNECTION Pipe and connection must be visible for inspection. | PARTIAL | 
| STORM CONNECTION Pipe and connection must be visible for inspection. | PASSED | 
| SANITARY CONNECTION Pipe and connection must be visible for inspection. | PARTIAL | 
| SANITARY CONNECTION Pipe and connection must be visible for inspection. | PASSED | 
| WATER CONNECTION Pipe and connection must be visible for inspection. | PASSED | 
| ROUGH IN PLUMBING Rough in plumbing must be complete including potable water piping. | PARTIAL | 
| ROUGH IN PLUMBING Rough in plumbing must be complete including potable water piping. | PASSED | 
| LATERAL BRACING & SHEATHING All nailing and blocking associated with braced wall panels to be completed for this inspection. Wood-based interior braced wall panels to be sheathed. Exterior braced wall panel locations to be clearly marked out on the interior and exterior. Interior braced wall panels to be clearly marked so their location can be seen now and later at the time of INTERIOR BRACED WALL PANEL INSPECTION. Additional anchor bolts shall be installed two per braced wall panel where a building contains framed walls supporting more than two floors. | FAILED | 
| LATERAL BRACING & SHEATHING All nailing and blocking associated with braced wall panels to be completed for this inspection. Wood-based interior braced wall panels to be sheathed. Exterior braced wall panel locations to be clearly marked out on the interior and exterior. Interior braced wall panels to be clearly marked so their location can be seen now and later at the time of INTERIOR BRACED WALL PANEL INSPECTION. Additional anchor bolts shall be installed two per braced wall panel where a building contains framed walls supporting more than two floors. | FAILED | 
| LATERAL BRACING & SHEATHING All nailing and blocking associated with braced wall panels to be completed for this inspection. Wood-based interior braced wall panels to be sheathed. Exterior braced wall panel locations to be clearly marked out on the interior and exterior. Interior braced wall panels to be clearly marked so their location can be seen now and later at the time of INTERIOR BRACED WALL PANEL INSPECTION. Additional anchor bolts shall be installed two per braced wall panel where a building contains framed walls supporting more than two floors. | PARTIAL | 
| LATERAL BRACING & SHEATHING All nailing and blocking associated with braced wall panels to be completed for this inspection. Wood-based interior braced wall panels to be sheathed. Exterior braced wall panel locations to be clearly marked out on the interior and exterior. Interior braced wall panels to be clearly marked so their location can be seen now and later at the time of INTERIOR BRACED WALL PANEL INSPECTION. Additional anchor bolts shall be installed two per braced wall panel where a building contains framed walls supporting more than two floors. | PASSED | 
| LATERAL BRACING & SHEATHING All nailing and blocking associated with braced wall panels to be completed for this inspection. Wood-based interior braced wall panels to be sheathed. Exterior braced wall panel locations to be clearly marked out on the interior and exterior. Interior braced wall panels to be clearly marked so their location can be seen now and later at the time of INTERIOR BRACED WALL PANEL INSPECTION. Additional anchor bolts shall be installed two per braced wall panel where a building contains framed walls supporting more than two floors. | PASSED | 
| PAPER/FLASHING/WATERPROOFING When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. | FAILED | 
| PAPER/FLASHING/WATERPROOFING When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. | PARTIAL | 
| PAPER/FLASHING/WATERPROOFING When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. | FAILED | 
| PAPER/FLASHING/WATERPROOFING When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. | PASSED | 
| ROUGH IN SPRINKLER Rough in sprinkler must be complete and visable for inspection. | PARTIAL | 
| ROUGH IN SPRINKLER Rough in sprinkler must be complete and visable for inspection. | PASSED | 
| FRAMING Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. | CANCELLED | 
| FRAMING Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. | CANCELLED | 
| FRAMING Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. | FAILED | 
| FRAMING Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. | FAILED | 
| FRAMING Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. | PASSED | 
| INSULATION Insulation and vapour barrier to be complete prior to inspection. | PARTIAL | 
| INSULATION Insulation and vapour barrier to be complete prior to inspection. | PARTIAL | 
| INSULATION Insulation and vapour barrier to be complete prior to inspection. | FAILED | 
| INSULATION Insulation and vapour barrier to be complete prior to inspection. | PASSED | 
| INTERIOR BRACED WALL PANELS The location of interior braced wall panels to be clearly indicated. This inspection is to take place prior to the installation of tape and joint compound. | PARTIAL | 
| INTERIOR BRACED WALL PANELS The location of interior braced wall panels to be clearly indicated. This inspection is to take place prior to the installation of tape and joint compound. | PASSED | 
| SPRINKLER FINAL-OLD Sprinkler system must be complete and operating as intended. | FAILED | 
| SPRINKLER FINAL-OLD Sprinkler system must be complete and operating as intended. | PASSED | 
| PLUMBING FINAL-OLD All fixtures must be in place. | PASSED | 
| OCCUPANCY-OLD | FAILED | 
| OCCUPANCY-OLD | FAILED | 
| OCCUPANCY-OLD | FAILED | 
| OCCUPANCY-OLD | PASSED 2020-04-03 | 
| Map | 
|---|
|  View in Google Earth (KML) | 
            
            Disclaimer:
            
            The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
            Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
            The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
            
            The Information Provided within this website is for Informational Purposes Only.
            It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.
            
        