BP122944 - 6703 Medd Road

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP122944 - 6703 Medd Road
Neighbourhood: Dover    
Street Address: 6703 Medd Road
Type of Application: Single / Two Family Alteration
File Number: BP122944
Date Application Submitted: February 16, 2017
Application Description: Construction of 2 storey addition, attached garage with living space above.

REVISION, 2017-MAY-17
1/ A man door to the front of garage.
2/ Stairs to garage floor from existing house.
3/ 2pc washroom added to back corner of garage.
4/ Stairwell and man door added to back of garage.
5/ Layout of upper floor changed, including a new laundry room......MLB
Application Status: ACTIVE
Permit Value: $180,000.00
Building Area: 93.60 M2
1,007.50 ft2
Builder: MACRAE CONSTRUCTION JIM
Issued Date: April 26, 2017
Expiry Date: April 26, 2019

Associated Properties

Address Zone More
6703 MEDD ROAD R1 Property Report

Process Steps

Task Status
EXCAVATION

Excavation of soil, prior to placing forms.

PARTIAL
FOOTING/FORMS

Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PARTIAL
FOOTING/FORMS

Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PASSED
FOOTING/FORMS

Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PARTIAL
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PASSED
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PARTIAL
UNDERSLAB PLUMBING

Complete underslab plumbing must be visable

FAILED
UNDERSLAB PLUMBING

Complete underslab plumbing must be visable

PASSED
STORM CONNECTION

Pipe and Connection must be visible for inspection

PARTIAL
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

PARTIAL
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete.

FAILED
Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.