BP120816 - 850 Jackson Road

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP120816 - 850 Jackson Road
Neighbourhood: Duke Point    
Street Address: 850 Jackson Road
Type of Application: Commercial / Multi / Industrial
File Number: BP120816
Date Application Submitted: May 04, 2015
Application Description: Construction of New Office Building, (Seaspan Ferries Corp), Building Classification 3.2.2.61, up to 2 Storeys, Sprinklered, Combustible or Non combustible Construction permitted, 2 exits required, GFA 205.03m2, Group D occupancy.
Application Status: HOLDBACK
Permit Value: $750,000.00
Issued Date: December 08, 2015
Completed Date: September 08, 2016
Expiry Date: December 08, 2017

Associated Properties

Address Zone More
850 JACKSON ROAD I4 Property Report
870 JACKSON ROAD I4 Property Report

Process Steps

Task Status
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PASSED
UNDERSLAB PLUMBING

complete underslab plumbing must be visable.

PARTIAL
STORM CONNECTION

Pipe and connection must be visible for inspection.

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

PASSED
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PASSED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

FAILED
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PASSED
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PARTIAL
SPRINKLER FINAL

Sprinkler system must be complete and operating as intended.

PASSED
PLUMBING FINAL

All fixtures must be in place.

PARTIAL
PLUMBING FINAL

All fixtures must be in place.

PASSED
OCCUPANCY FAILED
OCCUPANCY PASSED
Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

Help us improve our website

Don't include private or financial information in this form.