BP119949 - 352 Ninth Street (address changed from 994 Buffer Road)- Drawings Attached
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP119949 - 352 Ninth Street (address changed from 994 Buffer Road)- Drawings Attached | |
---|---|
Neighbourhood: | Harewood |
Street Address: | 352 Ninth Street (address changed from 994 Buffer Road)- Drawings Attached |
Type of Application: | Single / Two Family Dwelling |
File Number: | BP119949 |
Date Application Submitted: | July 08, 2014 |
Application Description: |
Construct a one storey single family dwelling on crawlspace with attached one car garage. Lot coverage is 39.29%, maximum allowed under Zoning Bylaw 4500 is 40%. Sept 10/14 - Revision: changing from crawlspace to slab-on-grade. mv |
Application Status: | COMPLETED |
Permit Value: | $185,356.69 |
Building Area: |
123.47 M2 1,329.02 ft2 |
Builder: | P H H CONSTRUCTION LTD |
Issued Date: | August 27, 2014 |
Completed Date: | February 24, 2015 |
Expiry Date: | August 27, 2016 |
Associated Properties
Address | Zone | More |
---|---|---|
352 NINTH STREET | R2 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING / FORMS
Inspection of forms prior to any concrete being poured |
CANCELLED |
FOOTING / FORMS
Inspection of forms prior to any concrete being poured |
PARTIAL |
FOOTING / FORMS
Inspection of forms prior to any concrete being poured |
PARTIAL |
FOOTING / FORMS
Inspection of forms prior to any concrete being poured |
PASSED |
PERIMETER DRAIN
For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering |
PARTIAL |
PERIMETER DRAIN
For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering |
PASSED |
UNDERSLAB PLUMBING
Complete underslab plumbing must be visable |
PASSED |
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete |
PASSED |
STORM CONNECTION
Pipe and Connection must be visible for inspection |
PASSED |
SANITARY CONNECTION
Pipe and Connection must be visible for inspection |
PASSED |
WATER CONNECTION
Pipe and Connection must be visable for inspection |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
PASSED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval |
FAILED |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval |
PARTIAL |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PASSED |
OCCUPANCY-OLD
Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish |
FAILED |
OCCUPANCY-OLD
Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish |
PASSED
2015-02-24 |
OCCUPANCY-OLD
Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish |
FAILED |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.
-
Recreation & Parks
- Recreation Facilities & Schedules
- Parks & Trails
- Activity Guide
- Parks Events
- Register for a Program
- Parks, Recreation and Culture Community Recreation - Winter 2021
- Parks, Recreation and Culture Pool Activities - Winter 2021
- Parks, Recreation and Culture Arena Activities - Winter 2021
-
City Services
- Garbage & Recycling
- Home & Property
- Water & Sewage
- Emergency Services
- Online Services
- Cemetery Services
- City Services Directory
-
Property & Development
-
Building Permits
- Online Building Permit Application
- Building Permit Revision
-
Application for a Residential Building Permit
- Access (driveway) Permit
- Accessory Building Permit
- Alteration Permit
- Building Envelope Repair
- Carriage House
- Demolition Permit
- Fence or Retaining Wall Permit
- Geotechnical Reports
- Locate Permit
- New Construction Permit
- Plumbing or Services Permit
- Secondary Suite Permit
- Special Inspection Permit
- Swimming Pool Permit
- Woodstove Installation Info
- Green Home Initiatives
-
Apply for a Commercial Building Permit
- Access (driveway) Permit
- Commercial Alteration Permit
- Building Envelope Repair Permit
- Demolition Permit
- Fence or Retaining Wall Permit
- Geotechnical Reports
- Leasehold Improvement
- Locate Permit
- New Commercial Construction Permit
- Occupant Load Permit
- Signs Permit
- Special Inspection Permit
- Sprinkler Requirements
- Fees and Bonding
- Commercial Plumbing Permit
- Bylaws for Building
- Forms and Guidelines
- Book a Building Inspection
- Report Illegal Construction
- Request Building Plans
- Building Permit Statistics
- Permit Fee Calculator
- Building News and Alerts
- Development Applications
- What's Building in my Neighbourhood
- Community Planning and Land Use Bylaws
- NanaimoMap
- Rebates
- Engineering Survey
- Soil Removal and Depositing
-
Building Permits
- Transportation & Mobility
-
Culture & Environment
- Grants
- Awards
- Community and Social Service Programs
-
Environment and Sustainability
- Environmental Responsibility
- Climate Action
- Protection & Restoration of Natural Spaces
- Zero Waste and Energy Management
- City Energy Projects
- Watercourse Protection
- Burn It Smart
- Invasive Species
- Pesticide Use
- Realtor Energy Efficiency Program
- Green Fleet
- Buttertubs Marsh Conservation Area
- Nanaimo Estuary
- Ecosystems
- Heritage
- Poetry
- Culture
- Public Art
-
Your Government
- News & Events
-
City Council
- Contact Mayor and Council
- Council Meetings
- Council Policies
- Mayor's Office
- Council Initiatives
- Proclamations
- Bastion Lighting Requests
- City Bylaws
- Budget & Finance
- Elections
-
Boards & Committees
- Committee Meeting Summaries
- Understanding Council Committee Structures
- Advisory Committee on Accessibility and Inclusiveness
- Design Advisory Panel
- Economic Development Task Force
- Environment Committee
- Finance and Audit Committee
- Governance and Priorities Committee
- Health and Housing Task Force
- Mayor's Task Force on Recovery and Resilience
- Special District 68 Sports Field and Recreation Committee
- Departments & Contacts
- Careers
- Projects
- Document Library
- Tourism
- Maps & Data
- Freedom of Information
- Social Issues and Community Safety
- Doing Business
- Get Involved
- About Nanaimo