BP120598 - 1408 Kaz Court
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP120598 - 1408 Kaz Court | |
|---|---|
| Neighbourhood: | Westwood | 
| Street Address: | 1408 Kaz Court | 
| Type of Application: | Single / Two Family Dwelling | 
| File Number: | BP120598 | 
| Date Application Submitted: | February 03, 2015 | 
| Application Description: | 
                Construction of a 2 1/2 storey single family dwelling on slab and crawlspace | 
        
| Application Status: | COMPLETED | 
| Permit Value: | $415,000.00 | 
| Building Area: | 
                        337.24 M2 3,630.02 ft2  | 
                
| Builder: | R DOLAN CONSTRUCTION LTD | 
| Issued Date: | March 03, 2015 | 
| File Close Date: | December 11, 2015 | 
| Expiry Date: | March 03, 2017 | 
Associated Properties
| Address | Zone | More | 
|---|---|---|
| 1408 KAZ COURT | R5 | Property Report | 
Process Steps
| Task | Status | 
|---|---|
| 
                                EXCAVATION
                                     Excavation of soil, prior to placing forms.  | 
                            PASSED | 
| 
                                FOOTING / FORMS
                                     Inspection of forms prior to any concrete being poured  | 
                            PARTIAL | 
| 
                                FOOTING / FORMS
                                     Inspection of forms prior to any concrete being poured  | 
                            PASSED | 
| 
                                PERIMETER DRAIN
                                     For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering  | 
                            CANCELLED | 
| 
                                PERIMETER DRAIN
                                     For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering  | 
                            PASSED | 
| 
                                UNDERSLAB PLUMBING
                                     Complete underslab plumbing must be visible  | 
                            PARTIAL | 
| 
                                STORM CONNECTION
                                     Pipe and Connection must be visible for inspection  | 
                            PASSED | 
| 
                                SANITARY CONNECTION
                                     Pipe and Connection must be visible for inspection  | 
                            PARTIAL | 
| 
                                WATER CONNECTION
                                     Pipe and Connection must be visable for inspection  | 
                            FAILED | 
| 
                                WATER CONNECTION
                                     Pipe and Connection must be visable for inspection  | 
                            PARTIAL | 
| 
                                ROUGH IN PLUMBING
                                     Rough in plumbing must be complete including potable water piping  | 
                            PARTIAL | 
| 
                                PAPER/FLASHING/WATERPROOFING
                                     When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.  | 
                            PARTIAL | 
| 
                                PAPER/FLASHING/WATERPROOFING
                                     When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.  | 
                            PASSED | 
| 
                                FRAMING
                                     Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval  | 
                            PARTIAL | 
| 
                                FRAMING
                                     Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval  | 
                            PASSED | 
| 
                                INSULATION
                                     Insulation and vapour barrier to be complete prior to inspection  | 
                            PASSED | 
| 
                                OCCUPANCY-OLD
                                     Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish  | 
                            FAILED | 
| 
                                OCCUPANCY-OLD
                                     Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish  | 
                            
                                PASSED
                                     2015-12-11  | 
                        
| Map | 
|---|
                          View in Google Earth (KML)
                     | 
                
            
            Disclaimer:
            
            The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
            Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
            The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
            
            The Information Provided within this website is for Informational Purposes Only.
            It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.
            
        

 View in Google Earth (KML)