BP120465 - 662 Albert Street

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP120465 - 662 Albert Street
Neighbourhood: Downtown/Old City    
Street Address: 662 Albert Street
Type of Application: Commercial / Multi / Industrial
File Number: BP120465
Date Application Submitted: December 16, 2014
Application Description: Fourplex - (4 dwelling units) sprinklered,
Part 9, Group C, 3 storey building , parking storage garage for 4 cars on 1st storey, sprinklered. BCBC buildng are = 133m2 (parking garage) . Each dwelling unit = 48.77 m2 1 hr. FRR/FS between dwelling units and storage garage . 1 hour FRR for exposed wall face on each side ( east and west ); 45 min FRR for rear ( south ) exposed wall face. 20 min FPR ULC labelled door for storage room. Alternative Solutions by Murray Johnson Engineering for 3rd storey single exit providing 1 hr FRR between corridor and suites and exit stairs. door 45 min FPR and for exit exposure providing sprinklers for exposed openings, and alternative solutions for building access and corridor width.
Application Status: COMPLETED
Permit Value: $278,792.00
Builder: SPECTRA LANDS INC
Issued Date: September 24, 2015
File Close Date: July 13, 2016
Expiry Date: September 24, 2017

Associated Properties

Address Zone More
4   662 ALBERT STREET R14 Property Report
2   662 ALBERT STREET R14 Property Report
1   662 ALBERT STREET R14 Property Report
3   662 ALBERT STREET R14 Property Report

Process Steps

Task Status
FIRELINE

Fireline for the sprinkler system must be complete and visable for inspection.

FAILED
FIRELINE

Fireline for the sprinkler system must be complete and visable for inspection.

PARTIAL
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

PASSED
STORM CONNECTION

Pipe and connection must be visible for inspection.

PASSED
SANITARY CONNECTION

Pipe and connection must be visible for inspection.

PASSED
WATER CONNECTION

Pipe and connection must be visible for inspection.

CANCELLED
WATER CONNECTION

Pipe and connection must be visible for inspection.

PARTIAL
WATER CONNECTION

Pipe and connection must be visible for inspection.

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

PARTIAL
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

PARTIAL
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

PASSED
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

PARTIAL
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

PASSED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

FAILED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PASSED
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

FAILED
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PASSED
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

PARTIAL
PLUMBING FINAL-OLD

All fixtures must be in place.

PARTIAL
OCCUPANCY-OLD FAILED
OCCUPANCY-OLD FAILED
OCCUPANCY-OLD PASSED

2016-07-13

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

Help us improve our website

Don't include private or financial information in this form.

Collection and use of your personal information
Information collected on this form is done so under the general authority of the Community Charter and Freedom of Information and Protection of Privacy Act (FOIPPA), and is protected in accordance with FOIPPA.  Personal information will only be used by authorized staff to fulfill the purpose for which it was originally collected, or for a use consistent with that purpose. Questions about the collection of your personal information may be referred to the Legislative Services Department at (250) 755-4405, or via email at foi@nanaimo.ca.
Privacy Policy