BP119716 - 645 Prideaux Street
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP119716 - 645 Prideaux Street | |
|---|---|
| Neighbourhood: | Downtown/Old City | 
| Street Address: | 645 Prideaux Street | 
| Type of Application: | Garage / Carport Permit | 
| File Number: | BP119716 | 
| Date Application Submitted: | May 05, 2014 | 
| Application Description: | 
                2 car garage with storage on second level. Revision 2014-NOV-21.... Add two skylights to two shed dormers....MLB Revison: Delete side french doors and revise rear single door to double french door. - Oct.7/2014 - LB REVISION: Oct 22,2014 - The structural engineer has changed from D W Webber to John Hofman. The floor system has changed direction, the floor beam has been revised and the center pad footing and post have been removed. The two upper windows on the right elevation are to be relocated to the lower floor.  | 
        
| Application Status: | COMPLETED | 
| Permit Value: | $25,000.00 | 
| Building Area: | 
                        76.55 M2 823.98 ft2  | 
                
| Issued Date: | June 19, 2014 | 
| File Close Date: | January 22, 2015 | 
| Expiry Date: | June 20, 2016 | 
Associated Properties
| Address | Zone | More | 
|---|---|---|
| 645 PRIDEAUX STREET | R15 | Property Report | 
Process Steps
| Task | Status | 
|---|---|
| 
                                EXCAVATION
                                     Excavation of soil, prior to placing forms.  | 
                            PASSED | 
| 
                                FOOTING/FORMS
                                     Inspection of forms prior to any cement being poured . For footing inspection, forms must be complete and approved plans (complete with City Stamp) must be onsite.  | 
                            PASSED | 
| 
                                UNDERSLAB PLUMBING
                                     Complete underslab plumbing must be visible.  | 
                            FAILED | 
| 
                                UNDERSLAB PLUMBING
                                     Complete underslab plumbing must be visible.  | 
                            PARTIAL | 
| 
                                UNDERSLAB PLUMBING
                                     Complete underslab plumbing must be visible.  | 
                            PASSED | 
| 
                                ROUGH IN PLUMBING
                                     Pipe and connection must be visable for inspection.  | 
                            PARTIAL | 
| 
                                ROUGH IN PLUMBING
                                     Pipe and connection must be visable for inspection.  | 
                            PARTIAL | 
| 
                                PAPER/FLASHING/WATERPROOFING
                                     When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.  | 
                            PARTIAL | 
| 
                                PAPER/FLASHING/WATERPROOFING
                                     When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.  | 
                            PASSED | 
| 
                                FRAMING
                                     Rough-in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.  | 
                            FAILED | 
| 
                                FRAMING
                                     Rough-in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.  | 
                            PARTIAL | 
| 
                                FRAMING
                                     Rough-in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.  | 
                            PASSED | 
| 
                                INSULATION
                                     Insulation and vapour barrier to be complete prior to inspection.  | 
                            PARTIAL | 
| 
                                INSULATION
                                     Insulation and vapour barrier to be complete prior to inspection.  | 
                            PASSED | 
| 
                                FINAL-OLD
                                     Final Approval as per requested on plans.  | 
                            FAILED | 
| 
                                FINAL-OLD
                                     Final Approval as per requested on plans.  | 
                            
                                PASSED
                                     2015-01-22  | 
                        
| Map | 
|---|
                          View in Google Earth (KML)
                     | 
                
            
            Disclaimer:
            
            The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
            Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
            The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
            
            The Information Provided within this website is for Informational Purposes Only.
            It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.
            
        

 View in Google Earth (KML)