Date Application Submitted: April 20, 2026
Application Description: Convert existing detached slab on grade garage to acupuncture clinic

REVISION 2026-JUL-16; Rough-in for future sink in waiting room
Application Status: ACTIVE
Permit Value: $35,000.00
Builder: JAYMAKER INDUSTRIES
Issued Date: May 27, 2026
Expiry Date: May 26, 2028

Associated Properties

Address Zone More
419 APPLEWOOD CRESCENT R5 Property Report

Process Steps

Task Status
FOOTING/FORMS

Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PASSED
UNDERSLAB PLUMBING

Complete underslab plumbing must be visible

PARTIAL
UNDERSLAB PLUMBING

Complete underslab plumbing must be visible

PARTIAL
UNDERSLAB INSULATION

Inspection required prior to placing slab concrete.

PASSED
SANITARY CONNECTION

Pipe and Connection must be visible for inspection

PASSED
UNDERSLAB RADON

Inspection of granular layer and piping

PASSED
WATER CONNECTION

Pipe and Connection must be visable for inspection

PARTIAL
WATER CONNECTION

Pipe and Connection must be visable for inspection

PASSED
ROUGH IN PLUMBING

Rough In plumbing must be complete including water piping.

FAILED
ROUGH IN PLUMBING

Rough In plumbing must be complete including water piping.

PARTIAL
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

PARTIAL
LATERAL BRACING & SHEATHING

All nailing and blocking associated with braced wall panels to be completed for this inspection. Wood-based interior braced wall panels to be sheathed. Exterior braced wall panel locations to be clearly marked out on the interior and exterior. Interior braced wall panels to be clearly marked so their location can be seen now and later at the time of INTERIOR BRACED WALL PANEL INSPECTION. Additional anchor bolts shall be installed two per braced wall panel where a building contains framed walls supporting more than two floors.

PASSED
FRAMING

Rough in plumbing & electrical must be complete.

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection

PASSED
Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.