BP131692 - 419 Applewood Crescent
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP131692 - 419 Applewood Crescent | |
|---|---|
| Neighbourhood: | Harewood |
| Street Address: | 419 Applewood Crescent |
| Type of Application: | Single / Two Family Alteration |
| File Number: | BP131692 |
| Date Application Submitted: | April 20, 2026 |
| Application Description: |
Convert existing detached slab on grade garage to acupuncture clinic REVISION 2026-JUL-16; Rough-in for future sink in waiting room |
| Application Status: | ACTIVE |
| Permit Value: | $35,000.00 |
| Builder: | JAYMAKER INDUSTRIES |
| Issued Date: | May 27, 2026 |
| Expiry Date: | May 26, 2028 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 419 APPLEWOOD CRESCENT | R5 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
|
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
PARTIAL |
|
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
PARTIAL |
|
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete. |
PASSED |
|
SANITARY CONNECTION
Pipe and Connection must be visible for inspection |
PASSED |
|
UNDERSLAB RADON
Inspection of granular layer and piping |
PASSED |
|
WATER CONNECTION
Pipe and Connection must be visable for inspection |
PARTIAL |
|
WATER CONNECTION
Pipe and Connection must be visable for inspection |
PASSED |
|
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
FAILED |
|
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
PARTIAL |
|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
|
LATERAL BRACING & SHEATHING
All nailing and blocking associated with braced wall panels to be completed for this inspection. Wood-based interior braced wall panels to be sheathed. Exterior braced wall panel locations to be clearly marked out on the interior and exterior. Interior braced wall panels to be clearly marked so their location can be seen now and later at the time of INTERIOR BRACED WALL PANEL INSPECTION. Additional anchor bolts shall be installed two per braced wall panel where a building contains framed walls supporting more than two floors. |
PASSED |
|
FRAMING
Rough in plumbing & electrical must be complete. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PASSED |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)