BP131632 - 100-460 Wallace Street
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP131632 - 100-460 Wallace Street | |
|---|---|
| Neighbourhood: | Downtown/Old City |
| Street Address: | 100-460 Wallace Street |
| Type of Application: | Leasehold Improvements |
| File Number: | BP131632 |
| Date Application Submitted: | March 06, 2026 |
| Application Description: |
Group E, (Pacific Arts Market) 190.1 m2, tenant fit out, work includes: interior partitions, accessible washroom, staff washroom, lighting, flooring Assembly use not permitted. Building Classification: BCBC 2018 Group D/E 3.2.2.63 and 3.2.2.69, 2 storey combustible, sprinklered with Fire Alarm system. Key FRR/FS are 45 min FRR/FS between retail CRU units, 45 min FRR/FS floor assemblies, 1 hr FRR/FS service rooms. Total GFA 1834.81 m2. |
| Application Status: | ACTIVE |
| Permit Value: | $350,000.00 |
| Issued Date: | March 26, 2026 |
| Expiry Date: | March 26, 2028 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 1 COMMERCIAL STREET | DT4 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visible for inspection. |
PARTIAL |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visible for inspection. |
PASSED |
|
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
FAILED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
|
PLUMBING FINAL
All fixtures must be in place. |
FAILED |
|
PLUMBING FINAL
All fixtures must be in place. |
PASSED |
|
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
FAILED |
|
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
PASSED |
|
OCCUPANCY
Booked is this tenant space has never had an occupancy or for a change in occupancy |
FAILED |
|
FINAL
Final Approval as per requirements on plans. |
FAILED |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)