BP131602 - 2337 Porcupine Hill Trail (BUILDING A) Inspection Only Permit

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP131602 - 2337 Porcupine Hill Trail (BUILDING A) Inspection Only Permit
Neighbourhood: Diver Lake    
Street Address: 2337 Porcupine Hill Trail (BUILDING A) Inspection Only Permit
Type of Application: Commercial / Multi / Industrial
File Number: BP131602
Date Application Submitted: February 19, 2026
Application Description: Inspection Only Permit-New construction of 2-storey, slab on grade detached single family dwellings with secondary suite.
Building Classification: BCBC 2024, Part 9 building (Group C) residential, sprinklered, combustible construction. GFA: House A is 241.24 m²

Main Building Permit- 2337 Porcupine Hill Trail, BP131520
Application Status: ACTIVE
Builder: G&K HOMES LTD
Issued Date: September 22, 2026
Expiry Date: September 22, 2028

Associated Properties

Address Zone More
2337 PORCUPINE HILL TRAIL R5 Property Report
2337 PORCUPINE HILL TRAIL Property Report
2339 PORCUPINE HILL TRAIL Property Report

Process Steps

Task Status
FOOTING/FORMS

Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PARTIAL
FOOTING/FORMS

Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PASSED
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PARTIAL
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

PARTIAL
UNDERSLAB INSULATION

Inspection required prior to placing slab concrete.

PASSED
SANITARY CONNECTION

Pipe and connection must be visible for inspection.

PASSED
WATER CONNECTION

Pipe and connection must be visible for inspection.

PARTIAL
UNDERSLAB RADON

Inspection of granular layer and piping

PASSED
LATERAL BRACING & SHEATHING

All nailing and blocking associated with braced wall panels to be completed for this inspection. Wood-based interior braced wall panels to be sheathed. Exterior braced wall panel locations to be clearly marked out on the interior and exterior. Interior braced wall panels to be clearly marked so their location can be seen now and later at the time of INTERIOR BRACED WALL PANEL INSPECTION. Additional anchor bolts shall be installed two per braced wall panel where a building contains framed walls supporting more than two floors.

SCHEDULED
INTERIOR BRACED WALL PANELS

The location of interior braced wall panels to be clearly indicated. This inspection is to take place prior to the installation of tape and joint compound.

SCHEDULED
Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.