BP131560 - 741 Third Street, (NAC Reception Office)
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP131560 - 741 Third Street, (NAC Reception Office) | |
|---|---|
| Neighbourhood: | University District |
| Street Address: | 741 Third Street, (NAC Reception Office) |
| Type of Application: | Commercial / Multi-Res Alteration |
| File Number: | BP131560 |
| Date Application Submitted: | February 10, 2026 |
| Application Description: |
Renovation of reception offices accessed from building entry facing Third Street. Existing Building Classification (BP102711): BCBC 1998 3.2.2.33. Group A-3. 5,626 m2 building area, one storey, facing 3 streets, noncombustible construction, with sprinkler and fire alarm. Attached at NDSS gymnasium by 2-hr firewall (separate buildings). 45-min FRR floor above basement mechanical room. |
| Application Status: | COMPLETED |
| Permit Value: | $90,000.00 |
| Issued Date: | May 04, 2026 |
| File Close Date: | September 28, 2026 |
| Expiry Date: | May 04, 2028 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 741 THIRD STREET | PRC3 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
FAILED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
CANCELLED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
CANCELLED |
|
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
FAILED |
|
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
PASSED |
|
PLUMBING FINAL
All fixtures must be in place. |
FAILED |
|
PLUMBING FINAL
All fixtures must be in place. |
PASSED |
|
FINAL
Final approval as per requirements on plans. |
FAILED |
|
FINAL
Final approval as per requirements on plans. |
FAILED |
|
FINAL
Final approval as per requirements on plans. |
PASSED
2026-09-28 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)