BP131560 - 741 Third Street, (NAC Reception Office)

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP131560 - 741 Third Street, (NAC Reception Office)
Neighbourhood: University District    
Street Address: 741 Third Street, (NAC Reception Office)
Type of Application: Commercial / Multi-Res Alteration
File Number: BP131560
Date Application Submitted: February 10, 2026
Application Description: Renovation of reception offices accessed from building entry facing Third Street.

Existing Building Classification (BP102711): BCBC 1998 3.2.2.33. Group A-3. 5,626 m2 building area, one storey, facing 3 streets, noncombustible construction, with sprinkler and fire alarm. Attached at NDSS gymnasium by 2-hr firewall (separate buildings). 45-min FRR floor above basement mechanical room.
Application Status: COMPLETED
Permit Value: $90,000.00
Issued Date: May 04, 2026
File Close Date: September 28, 2026
Expiry Date: May 04, 2028

Associated Properties

Address Zone More
741 THIRD STREET PRC3 Property Report

Process Steps

Task Status
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

FAILED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

CANCELLED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

CANCELLED
SPRINKLER FINAL

Sprinkler system must be complete and operating as intended.

FAILED
SPRINKLER FINAL

Sprinkler system must be complete and operating as intended.

PASSED
PLUMBING FINAL

All fixtures must be in place.

FAILED
PLUMBING FINAL

All fixtures must be in place.

PASSED
FINAL

Final approval as per requirements on plans.

FAILED
FINAL

Final approval as per requirements on plans.

FAILED
FINAL

Final approval as per requirements on plans.

PASSED

2026-09-28

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.