BP131534 - 325 Watfield Avenue, Inspection Only (Building A and parking garage)
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP131534 - 325 Watfield Avenue, Inspection Only (Building A and parking garage) | |
|---|---|
| Neighbourhood: | University District |
| Street Address: | 325 Watfield Avenue, Inspection Only (Building A and parking garage) |
| Type of Application: | Commercial / Multi / Industrial |
| File Number: | BP131534 |
| Date Application Submitted: | September 08, 2025 |
| Application Description: |
Inspections Only - BLDG A and Parking Garage Construction of two six storey multi-residential buildings above a 2 level common parkade, 171 dwelling units. Building Classification 3.2.2.51 Group C with subsidiary F3 storage garage Building area Bldg A: 1165..83 m², Bldg B west: 1246.7 m², Bldg B east: 671.38 m², Parkade: 6353.23 m². Sprinklered with fire alarm system. Key FRR/FS are 1 Hr FRR/FS 54 STC between suites, 1 Hr FRR/FS 53 STC between suites and corridor/stair, 1 Hr FRR/FS 62 STC at floors between suites, 2 Hr FRR/FS at firewall and between suites and parkade floor. All doors in fire separations are self-closing with positive latching system. Alternative Solution for Building Classification to address building height and building area by way of a horizontal 2 hr F/S acting as a firewall type construction and to create a 3.2.1.2 basement storage garage. Main permit: BP131177 |
| Application Status: | ACTIVE |
| Builder: | IRONCLAD DEVELOPMENTS INC |
| Issued Date: | February 10, 2026 |
| Expiry Date: | February 10, 2028 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 325 WATFIELD AVENUE | COR2 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
CANCELLED |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PARTIAL |
|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PARTIAL |
|
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
MONITORED |
|
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
MONITORED |
|
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
MONITORED |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)