BP131414 - 2575 East Wellington
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP131414 - 2575 East Wellington | |
|---|---|
| Neighbourhood: | Westwood |
| Street Address: | 2575 East Wellington |
| Type of Application: | Single / Two Family Dwelling |
| File Number: | BP131414 |
| Date Application Submitted: | January 23, 2026 |
| Application Description: |
New Single Family Dwelling on crawlspace Building Classification: BCBC 2024, Part 9 building (Group C) residential, combustible construction. Building area:2575 East Wellington Road 325.52m² and 2590 Stobart Rd is 399.80m² ,Total GFA 725.32m². REVISION; 2026-AUG-24 - Windows on right, left, decreased in width by 12", window replaced with three smaller windows in rear. Wet bar, bar sink, and non-structural double closet added in rec room above garage, Man door and window replaced with double door on right side. |
| Application Status: | ACTIVE |
| Permit Value: | $1,000,000.00 |
| Building Area: |
325.52 M2 3,503.86 ft2 |
| Builder: | MCMANN GROUP INC. |
| Issued Date: | March 24, 2026 |
| Expiry Date: | March 23, 2028 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 2575 EAST WELLINGTON ROAD | AR2 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING / FORMS
Inspection of forms prior to any concrete being poured |
PARTIAL |
|
FOOTING / FORMS
Inspection of forms prior to any concrete being poured |
PASSED |
|
PERIMETER DRAIN
For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering |
PARTIAL |
|
UNDERSLAB RADON
Inspection of granular layer and piping |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
PARTIAL |
|
LATERAL BRACING & SHEATHING
All nailing and blocking associated with braced wall panels to be completed for this inspection. Wood-based interior braced wall panels to be sheathed. Exterior braced wall panel locations to be clearly marked out on the interior and exterior. Interior braced wall panels to be clearly marked so their location can be seen now and later at the time of INTERIOR BRACED WALL PANEL INSPECTION. Additional anchor bolts shall be installed two per braced wall panel where a building contains framed walls supporting more than two floors. |
PASSED |
|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
|
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
FAILED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PASSED |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)