BP131413 - 102-125 Wallace Street

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP131413 - 102-125 Wallace Street
Neighbourhood: Downtown/Old City    
Street Address: 102-125 Wallace Street
Type of Application: Leasehold Improvements
File Number: BP131413
Date Application Submitted: December 10, 2025
Application Description: Complete and occupy, Group D (Sage Midwives), 163.97 m2, work includes partition walls to create exam rooms, 2 washrooms, storage room, meeting room, laundry and kitchen, changes to plumbing and sprinkler system

Bldg Classification BCBC2006 3.2.2.54.60,:1203m2, 3-storey, office bldg.1083.4m2 parking/retail level, 1049.7 m2 Level 2 office floor. 1096.4m2 Level 3 office floor and 55.5m2 service area on roof. 1.5 hr fire separation btwn storage garage, lobby, retail spaces & offices above, 3/4 hr FS exit stairs & elevator, FS only between lobby & retail suites, 1 hr FS for boiler room from adjoining suites.
Application Status: COMPLETED
Permit Value: $106,000.00
Builder: WINDLEY CONTRACTING LTD
Issued Date: January 28, 2026
File Close Date: May 04, 2026
Expiry Date: January 28, 2028

Associated Properties

Address Zone More
125 WALLACE STREET DT3 Property Report

Process Steps

Task Status
UNDERSLAB PLUMBING

Complete underslab plumbing must be visible.

FAILED
UNDERSLAB PLUMBING

Complete underslab plumbing must be visible.

PARTIAL
UNDERSLAB PLUMBING

Complete underslab plumbing must be visible.

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visible for inspection.

PARTIAL
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visible for inspection.

PASSED
FRAMING

Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval.

PARTIAL
FRAMING

Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval.

PASSED
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PASSED
PLUMBING FINAL

All fixtures must be in place.

FAILED
PLUMBING FINAL

All fixtures must be in place.

PASSED
SPRINKLER FINAL

Sprinkler system must be complete and operating as intended.

FAILED
SPRINKLER FINAL

Sprinkler system must be complete and operating as intended.

PASSED
OCCUPANCY

Booked is this tenant space has never had an occupancy or for a change in occupancy

FAILED
OCCUPANCY

Booked is this tenant space has never had an occupancy or for a change in occupancy

PASSED

2026-05-04

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.