BP131385 - 345 Wallace Street, (MNP)
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP131385 - 345 Wallace Street, (MNP) | |
|---|---|
| Neighbourhood: | Downtown/Old City |
| Street Address: | 345 Wallace Street, (MNP) |
| Type of Application: | Leasehold Improvements |
| File Number: | BP131385 |
| Date Application Submitted: | December 05, 2025 |
| Application Description: |
Renovations to 4th and 5th floors Existing 5-storey, sprinklered, noncombustible, 1172 sq m office/parking/storage building. Level 1 (3794 sq ft) and level 2 (4410 sq ft): 3.2.2.54 (F2) = 2 hr FRR floors; Level 3 (11004 sq ft): 3.2.2.61 (F3) = 1.5 hr FRR floor; Level 4 (12489 sq ft) and level 5 (12621 sq ft): 3.2.2.41 (D) = 1 hr FRR floors. 1992 BC Bldg code applies. Equivalences by GHL for eliminating areas of refuge, spatial separation openings at north elevation, sprinkler-protected glazing at parking level, single egress from over-sized offices and storage rooms, and reduced distance between level 1 exits. |
| Application Status: | ACTIVE |
| Permit Value: | $1,745,000.00 |
| Builder: | WINDLEY CONTRACTING LTD |
| Issued Date: | January 13, 2026 |
| Expiry Date: | January 13, 2028 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 345 WALLACE STREET | DT2 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete. |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visible for inspection. |
PARTIAL |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visible for inspection. |
PARTIAL |
|
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
PLUMBING FINAL
All fixtures must be in place. |
FAILED |
|
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
FAILED |
|
FINAL
Final Approval as per requirements on plans. |
FAILED |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)