BP131322 - 59-6631 Island Hwy N, (MAC)
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP131322 - 59-6631 Island Hwy N, (MAC) | |
|---|---|
| Neighbourhood: | Dover |
| Street Address: | 59-6631 Island Hwy N, (MAC) |
| Type of Application: | Leasehold Improvements |
| File Number: | BP131322 |
| Date Application Submitted: | October 27, 2025 |
| Application Description: |
Tenant Improvement, Unit 59 (MAC), Group E, 98 m2 floor area for a new tenant in this existing CRU. Scope of work includes: new partitions, finishes, millwork, the addition of one sink and sprinkler changes throughout tenant space to suit. Existing washroom to remain. 1 HR FS/FRR to be maintained at exit corridor. Existing Building: 2018 BCBC Governing Articles 3.2.2.24/ 3.2.2.64/3.2.2.55, sprinklered to NFPA 13, non-combustible, fire alarm. |
| Application Status: | COMPLETED |
| Issued Date: | December 31, 2025 |
| File Close Date: | April 13, 2026 |
| Expiry Date: | December 31, 2027 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 6631 ISLAND HIGHWAY N | CC4 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible. |
PASSED |
|
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete. |
PARTIAL |
|
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete. |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visible for inspection. |
PASSED |
|
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PARTIAL |
|
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PARTIAL |
|
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
|
PLUMBING FINAL
All fixtures must be in place. |
FAILED |
|
PLUMBING FINAL
All fixtures must be in place. |
PASSED |
|
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
FAILED |
|
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
PASSED |
|
FINAL
Final Approval as per requirements on plans. |
FAILED |
|
FINAL
Final Approval as per requirements on plans. |
PASSED
2026-04-13 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)