BP131316 - 501A - 530 Fifth Street (Bosley's Pet Valu)
Neighbourhood: University District    
Street Address: 501A - 530 Fifth Street (Bosley's Pet Valu)
Type of Application: Leasehold Improvements
File Number: BP131316
Date Application Submitted: October 22, 2025
Application Description: Unit 501A (464.52 m2 Group E) tenant improvement for Bosley's retail store. Installation of two dog wash sinks, mop sink, clothes washer, hot water heater, accessible washroom, back of house partitions, and alteration of existing sprinkler heads to suit store layout. 2-hr FRR/FS to adjacent Anytime Fitness in Unit 501B (887 m2 Group A2 BP130801).

Existing Building Classification (BP113380): BCBC 2006 3.2.2.27./3.2.2.57. Group A2/E, 6,681.55m2 building area, noncombustible construction, sprinklered, with fire alarm. 2-hr FRR/FS floors, 1-hr FRR mezz, loadbearing supports have FRR not less than supported assembly.
Application Status: COMPLETED
Permit Value: $291,360.00
Issued Date: February 12, 2026
File Close Date: June 25, 2026
Expiry Date: February 14, 2028

Associated Properties

Address Zone More
530 FIFTH STREET CC3 Property Report

Process Steps

Task Status
UNDERSLAB PLUMBING

Complete underslab plumbing must be visible.

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

FAILED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visible for inspection.

PARTIAL
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visible for inspection.

PASSED
FRAMING

Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval.

PASSED
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PASSED
PLUMBING FINAL

All fixtures must be in place.

FAILED
PLUMBING FINAL

All fixtures must be in place.

PASSED
SPRINKLER FINAL

Sprinkler system must be complete and operating as intended.

FAILED
SPRINKLER FINAL

Sprinkler system must be complete and operating as intended.

PASSED
APPROVAL-FIRE

Approval required prior to Occupancy

APPROVED
FINAL

Final Approval as per requirements on plans.

FAILED
FINAL

Final Approval as per requirements on plans.

PASSED

2026-06-25

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.