BP131140 - 104-2517 Bowen Road, (MEC)
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP131140 - 104-2517 Bowen Road, (MEC) | |
|---|---|
| Neighbourhood: | Diver Lake |
| Street Address: | 104-2517 Bowen Road, (MEC) |
| Type of Application: | Leasehold Improvements |
| File Number: | BP131140 |
| Date Application Submitted: | August 21, 2025 |
| Application Description: |
Tenant Improvement, Unit 104 (Mountain Equipment Co-op) Group E (2485 m2), Work includes mechanical changes to CRU. Installation of 2 universal W.C. and staff kitchen area. Relocation of Fire Annunciator Panel and pull stations, Fire Alarm verification report and Nanaimo Fire Department approval required. Installation of new interior finishes and changing areas. Sprinkler work includes installation of 62 new heads to accommodate new layout and finishes. Existing Building 4263m2 Re classified to BCBC 2018 - 3.2.2.61 Group D & 3.2.2.67. Group E, One-storey combustible & non-combustible construction, 45min. FRR for mezzanines and supporting structures if combustible construction, sprinklered with fire alarm system, with existing equivalency for size of enclosed (office) mezzanine for CRU - D REVISION:Minor updates to floor layouts to suit existing conditions. |
| Application Status: | COMPLETED |
| Issued Date: | September 29, 2025 |
| File Close Date: | December 04, 2025 |
| Expiry Date: | September 29, 2027 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 2517 BOWEN ROAD | COR3 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible. |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visible for inspection. |
PARTIAL |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visible for inspection. |
PARTIAL |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visible for inspection. |
PASSED |
|
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PARTIAL |
|
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
|
PLUMBING FINAL
All fixtures must be in place. |
FAILED |
|
PLUMBING FINAL
All fixtures must be in place. |
PASSED |
|
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
FAILED |
|
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
FAILED |
|
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
PASSED |
|
APPROVAL-FIRE
Approval required prior to Occupancy |
APPROVED |
|
FINAL
Final Approval as per requirements on plans. |
FAILED |
|
FINAL
Final Approval as per requirements on plans. |
PASSED
2025-12-04 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)