BP131125 - 101-525 Third Street (All Little Cubs Learning Centre)
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP131125 - 101-525 Third Street (All Little Cubs Learning Centre) | |
|---|---|
| Neighbourhood: | University District |
| Street Address: | 101-525 Third Street (All Little Cubs Learning Centre) |
| Type of Application: | Commercial / Multi-Res Alteration |
| File Number: | BP131125 |
| Date Application Submitted: | August 01, 2025 |
| Application Description: |
(All Little Cubs Learning Centre) Unit #101 – “Change of Use” of CRU from (shell) Group E to Group A2 (3.2.2.24) for a daycare program for children over 30 months. Unit area 232.81m2. Improvements include creating 1 universal washroom, 1 unisex washroom with 3 toilet stalls and wash basins, 2 kitchen sinks, 1 laundry room with laundry sink and clothes washer. Changes to NFPA 13 sprinkler system. 2026-JUL-16 REVISION: See internal notes Exist Bldg: BCBC 2024, 22 strata unit apartment building w/ 5 commercial rental units on main flr and basement level. 794 m2, 4 storey, Group C 3.2.2.52, Group E 3.2.2.67, Group D 3.2.2.61 & Parking Garage Group F3 3.2.2.86. Sprinklered, Fire Alarm system, combustible and/or n/c construction. 1 hr. FS/FRR between suites, suites and corridors/stairwells/elevator shaft and 1 hr. F.R.R. for flr assemblies, load-bearing walls and columns. Parking Garage is separated from the remainder of the bldg by a 1.5 hrs. FS/F.R.R. |
| Application Status: | COMPLETED |
| Permit Value: | $300,000.00 |
| Builder: | STF CONTRACTING INC |
| Issued Date: | January 26, 2026 |
| File Close Date: | July 23, 2026 |
| Expiry Date: | January 26, 2028 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 101 525 THIRD STREET | COR2 | Property Report |
| 525 THIRD STREET | COR2 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
|
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
PASSED |
|
PLUMBING FINAL
All fixtures must be in place. |
PASSED |
|
APPROVAL-FIRE
Approval required prior to Occupancy |
APPROVED |
| OCCUPANCY |
PASSED
2026-07-23 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)