BP131083 - 269 Craig St (Building B)
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP131083 - 269 Craig St (Building B) | |
|---|---|
| Neighbourhood: | University District |
| Street Address: | 269 Craig St (Building B) |
| Type of Application: | Single / Two Family Dwelling |
| File Number: | BP131083 |
| Date Application Submitted: | July 28, 2025 |
| Application Description: |
New construction of a 3-storey detached duplex on slab on grade on a residential R5-zoned lot. Building Classification: BCBC 2024, Part 9 building (Group C) residential, unsprinklered, combustible construction. Building area: Unit A (309 Elizabeth Street ) is 74.61 m² and Unit B (269 CRAIG STREET) is 74.61 m², Total building area-149.22 m². Total GFA 316.50 m². Building A ((309 Elizabeth Street )- 158.25 GFA Building B (269 CRAIG STREET)- 158.25 GFA 2025-OCT-24 REVISION: Pad footing added. Location of fireplace changed. Length of engineered beam increased. Window in hutch deleted. Window sizes in all bedrooms changed. |
| Application Status: | ACTIVE |
| Permit Value: | $360,659.66 |
| Building Area: |
158.25 M2 1,703.39 ft2 |
| Builder: | MICHAEL PARKER CONSTRUCTION LTD |
| Issued Date: | October 03, 2025 |
| Expiry Date: | October 03, 2027 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 269 CRAIG STREET | Property Report | |
| 309 ELIZABETH STREET | R5 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING / FORMS
Inspection of forms prior to any concrete being poured |
PARTIAL |
|
FOOTING / FORMS
Inspection of forms prior to any concrete being poured |
PASSED |
|
PERIMETER DRAIN
For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering |
PARTIAL |
|
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
PARTIAL |
|
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete |
PASSED |
|
SANITARY CONNECTION
Pipe and Connection must be visible for inspection |
PARTIAL |
|
SANITARY CONNECTION
Pipe and Connection must be visible for inspection |
PASSED |
|
WATER CONNECTION
Pipe and Connection must be visable for inspection |
PARTIAL |
|
UNDERSLAB RADON
Inspection of granular layer and piping |
FAILED |
|
UNDERSLAB RADON
Inspection of granular layer and piping |
PASSED |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)