BP130963 - 60 & 61-6631 Island Highway N, (Specsavers)
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP130963 - 60 & 61-6631 Island Highway N, (Specsavers) | |
|---|---|
| Neighbourhood: | Dover |
| Street Address: | 60 & 61-6631 Island Highway N, (Specsavers) |
| Type of Application: | Commercial / Multi-Res Alteration |
| File Number: | BP130963 |
| Date Application Submitted: | May 22, 2025 |
| Application Description: |
Combine 2 CRU's into Unit 61 for optical retail store(Specsavers). Interior alteration for new optical retailer with on-site optometrist. Floor area 307.57 m². Work includes capping one washroom, installing 8 sinks and 1 HWT, adding and relocating 35 sprinkler-heads. Existing Building Classification: 2018 BCBC Governing Articles 3.2.2.24/ 3.2.2.55./3.2.2.64, Building area: 70648 m2, sprinklered to NFPA 13, non-combustible, fire alarm. alt solution for exiting. |
| Application Status: | COMPLETED |
| Permit Value: | $300,000.00 |
| Issued Date: | August 27, 2025 |
| File Close Date: | October 31, 2025 |
| Expiry Date: | August 27, 2027 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 6631 ISLAND HIGHWAY N | CC4 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PARTIAL |
|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PASSED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
|
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
FAILED |
|
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
FAILED |
|
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
PASSED |
|
PLUMBING FINAL
All fixtures must be in place. |
FAILED |
|
PLUMBING FINAL
All fixtures must be in place. |
PASSED |
|
FINAL
Final approval as per requirements on plans. |
FAILED |
|
FINAL
Final approval as per requirements on plans. |
PASSED
2025-10-31 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)