BP130828 - 390 Selby Street (Alias) Parent: 486 Franklyn Street
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP130828 - 390 Selby Street (Alias) Parent: 486 Franklyn Street | |
|---|---|
| Neighbourhood: | Downtown/Old City |
| Street Address: | 390 Selby Street (Alias) Parent: 486 Franklyn Street |
| Type of Application: | Commercial / Multi-Res Alteration |
| File Number: | BP130828 |
| Date Application Submitted: | April 07, 2025 |
| Application Description: |
Commercial Alteration: Change of occupancy from Group F-2 to Group D Personal Service use (hair salon). Scope of work includes structural upgrades to existing roof structure, new interior layout, replacement of overhead exterior door with new storefront entrance, removal of 3 windows replaced with 1-hr FRR exterior wall assembly, addition of universal washroom, 4 sinks, 1 clothes washer and 1 hot water tank. Existing unconditioned space to meet 9.36.6 Energy Step Code Level 3. Building Re:classification: 2024 BCBC Part 9, Group D occupancy 106.1 m2, unsprinklered, combustible and non-combustible construction. |
| Application Status: | COMPLETED |
| Permit Value: | $38,000.00 |
| Issued Date: | May 07, 2025 |
| File Close Date: | September 23, 2025 |
| Expiry Date: | May 07, 2027 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 486 FRANKLYN STREET | DT2 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PASSED |
|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
FAILED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
FAILED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
|
PLUMBING FINAL
All fixtures must be in place. |
PASSED |
|
FINAL
Final approval as per requirements on plans. |
FAILED |
|
FINAL
Final approval as per requirements on plans. |
PASSED
2025-09-23 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)