BP130825 - 550 Seventh Street, (John Barsby Secondary School)
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP130825 - 550 Seventh Street, (John Barsby Secondary School) | |
|---|---|
| Neighbourhood: | Harewood |
| Street Address: | 550 Seventh Street, (John Barsby Secondary School) |
| Type of Application: | Commercial / Multi-Res Alteration |
| File Number: | BP130825 |
| Date Application Submitted: | April 04, 2025 |
| Application Description: |
Washroom 104 & 415 improvements Work Includes layout changes to create a new all gender washroom area (104) and compliant, updated Universal WC (415) Total plumbing changes after layout change:+1 toilet and -1Urinal Sprinkler changes to suit layout: 4 additional heads to suit new layout Existing building description: 43000 sq.ft. in 3 buildings: Building A: 1155sq.m. two-storey, sprinklered, non-combust library/admin addition with interconnected 2nd storey. 3.2.2.22 applies: Floors, mezz, walls etc.. 1 hour FRR non-combust construction req'd. Building B: existing, sprinklered, two-storey combustible building. 3.2.2.21 applies. Floors, mezz, walls, etc. 45 min. FRR or non-combustible construction. Building C/D: 1810 sq.m., one-storey, combust sprinklered & 2490 sq.m. one storey, sprinklered shop wing. 3.2.2.21 applies: Floors, mezz, walls, etc. 45 min. FRR or non combust. Building E: existing 1370 sq.m. sprinklered building REVISION: Change to electrical drawings |
| Application Status: | COMPLETED |
| Permit Value: | $340,000.00 |
| Issued Date: | August 25, 2025 |
| File Close Date: | May 22, 2026 |
| Expiry Date: | August 25, 2027 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 550 SEVENTH STREET | CS1 , PRC2 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PARTIAL |
|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
|
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
FAILED |
|
PLUMBING FINAL
All fixtures must be in place. |
PASSED |
|
FINAL
Final approval as per requirements on plans. |
CANCELLED |
|
FINAL
Final approval as per requirements on plans. |
FAILED |
|
FINAL
Final approval as per requirements on plans. |
PASSED
2026-05-22 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)