BP130745 - 1960 Mountain Vista Drive (BLDG A)
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP130745 - 1960 Mountain Vista Drive (BLDG A) | |
|---|---|
| Neighbourhood: | Diver Lake |
| Street Address: | 1960 Mountain Vista Drive (BLDG A) |
| Type of Application: | Commercial / Multi / Industrial |
| File Number: | BP130745 |
| Date Application Submitted: | March 05, 2025 |
| Application Description: |
New construction of a 3-Storey, slab-on-grade, 24-unit apartment building. Building Classification: 3.2.2.55, Group C, 741.33m2 building area, combustible construction, sprinklered to NFPA 13R with a single stage fire alarm system. Key FS/FRR are: 45min FS/FRR between units, elevator, floor assemblies and loadbearing supports. All doors in fire separations to be self-closing with positive latching mechanisms. Total GFA is 2223.99 m2. This building is part of a multi-family residential development with a total of 4 buildings with a combined total of 93 dwelling units. |
| Application Status: | ACTIVE |
| Permit Value: | $4,800,000.00 |
| Builder: | TECTONICA MANAGEMENT INC |
| Issued Date: | January 29, 2026 |
| Expiry Date: | January 29, 2028 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 1960 MOUNTAIN VISTA DRIVE | R6 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
CANCELLED |
|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PARTIAL |
|
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete. |
PARTIAL |
|
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete. |
PARTIAL |
|
WATER CONNECTION
Pipe and connection must be visible for inspection. |
PARTIAL |
|
UNDERSLAB RADON
Inspection of granular layer and piping |
FAILED |
|
UNDERSLAB RADON
Inspection of granular layer and piping |
FAILED |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.