BP130712 - 1340 Townsite Road (Lot 11)
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP130712 - 1340 Townsite Road (Lot 11) | |
|---|---|
| Neighbourhood: | Townsite |
| Street Address: | 1340 Townsite Road (Lot 11) |
| Type of Application: | Single / Two Family Dwelling |
| File Number: | BP130712 |
| Date Application Submitted: | March 06, 2025 |
| Application Description: |
New construction of two-storey single-family dwelling with secondary suite slab on grade REVISION 2025-OCT-20: Removed garage wall, moved/added exterior doors, added barsink |
| Application Status: | ACTIVE |
| Permit Value: | $470,187.38 |
| Building Area: |
248.01 M2 2,669.55 ft2 |
| Builder: | PJ & R HOLDINGS LTD |
| Issued Date: | September 09, 2025 |
| Expiry Date: | September 09, 2027 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 1340 TOWNSITE ROAD | R5 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING / FORMS
Inspection of forms prior to any concrete being poured |
PASSED |
|
FOOTING / FORMS
Inspection of forms prior to any concrete being poured |
PASSED |
|
PERIMETER DRAIN
For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering |
PARTIAL |
|
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
PARTIAL |
|
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete |
CANCELLED |
|
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete |
PASSED |
|
UNDERSLAB RADON
Inspection of granular layer and piping |
PASSED |
|
LATERAL BRACING & SHEATHING
All nailing and blocking associated with braced wall panels to be completed for this inspection. Wood-based interior braced wall panels to be sheathed. Exterior braced wall panel locations to be clearly marked out on the interior and exterior. Interior braced wall panels to be clearly marked so their location can be seen now and later at the time of INTERIOR BRACED WALL PANEL INSPECTION. Additional anchor bolts shall be installed two per braced wall panel where a building contains framed walls supporting more than two floors. |
PASSED |
|
APPROVAL-ENGINEERING
Approval required prior to Occupancy |
REQUIRED |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)