BP130709 - 1584 Naylor Crescent
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP130709 - 1584 Naylor Crescent | |
---|---|
Neighbourhood: | Chase River |
Street Address: | 1584 Naylor Crescent |
Type of Application: | Fire Damage |
File Number: | BP130709 |
Date Application Submitted: | March 04, 2025 |
Application Description: |
Reconstruct Single Family Dwelling damaged by fire. 2025-JUN-18 REVISION: Change bathroom and mechanical location in the basement and add a sanitary sump pump for the 3 piece bathroom. |
Application Status: | ACTIVE |
Permit Value: | $250,000.00 |
Builder: | OCEANS EDGE CONTRACTING LTD |
Issued Date: | May 02, 2025 |
Expiry Date: | May 02, 2027 |
Associated Properties
Address | Zone | More |
---|---|---|
1584 NAYLOR CRESCENT | R5 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City Stamp) must be on site. |
PARTIAL |
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City Stamp) must be on site. |
PASSED |
PERIMETER DRAIN
For perimter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
UNDERSLAB RADON
Inspection of granular layer and piping |
PASSED |
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible. |
PARTIAL |
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete. |
PASSED |
LATERAL BRACING &SHEATHING
All nailing and blocking associated with braced wall panels to be completed for this inspection. Wood-based interior braced wall panels to be sheathed. Exterior braced wall panel locations to be clearly marked out on the interior and exterior. Interior braced wall panels to be clearly marked so their location can be seen now and later at the time of INTERIOR BRACED WALL PANEL INSPECTION. Additional anchor bolts shall be installed two per braced wall panel where a building contains framed walls supporting more than two floors. |
PARTIAL |
ROUGH IN PLUMBING
Pipe and connection must be visable for inspection. |
PARTIAL |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.