BP130687 - 1960 Island Diesel Way (Alias Bldg A) Parent: 1950 Island Diesel Way
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP130687 - 1960 Island Diesel Way (Alias Bldg A) Parent: 1950 Island Diesel Way | |
|---|---|
| Neighbourhood: | Northfield |
| Street Address: | 1960 Island Diesel Way (Alias Bldg A) Parent: 1950 Island Diesel Way |
| Type of Application: | Commercial / Multi / Industrial |
| File Number: | BP130687 |
| Date Application Submitted: | April 30, 2025 |
| Application Description: | New construction of 2 storey Industrial shell building for future warehouse (Bldg A). Building Classification: Group F2 3.2.2.79. 2420.92 m2 building area, sprinklered with fire alarm system. Key FRR/FS are 1-hr FRR/FS for service rooms and 45-min FRR/FS exit stairs. Alternative solution for protection of the north and east side exposed building faces with water curtain sprinklers to create a 2-hr and 1-hr fire resistance rating. Total GFA is 2794.67 m2. |
| Application Status: | ACTIVE |
| Permit Value: | $4,400,000.00 |
| Builder: | SAYWELL CONTRACTING LTD |
| Issued Date: | February 27, 2026 |
| Expiry Date: | February 28, 2028 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 1950 ISLAND DIESEL WAY | I3 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
|
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete. |
PARTIAL |
|
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete. |
CANCELLED |
|
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
MONITORED |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)