BP130639 - 2280 Ashlee Road, House B (Inspection Only Permit)

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP130639 - 2280 Ashlee Road, House B (Inspection Only Permit)
Neighbourhood: Westwood    
Street Address: 2280 Ashlee Road, House B (Inspection Only Permit)
Type of Application: Commercial / Multi / Industrial
File Number: BP130639
Date Application Submitted: February 11, 2025
Application Description: New construction of single-family dwelling with secondary suite - House B

BP130637 - Main Permit
BP130638 - House A
Application Status: ACTIVE
Issued Date: October 01, 2025
Expiry Date: October 01, 2027

Associated Properties

Address Zone More
2280 ASHLEE ROAD R5 Property Report

Process Steps

Task Status
FOOTING/FORMS

Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PARTIAL
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PARTIAL
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

PARTIAL
UNDERSLAB INSULATION

Inspection required prior to placing slab concrete.

FAILED
UNDERSLAB INSULATION

Inspection required prior to placing slab concrete.

PASSED
SANITARY CONNECTION

Pipe and connection must be visible for inspection.

PASSED
UNDERSLAB RADON

Inspection of granular layer and piping

FAILED
UNDERSLAB RADON

Inspection of granular layer and piping

FAILED
UNDERSLAB RADON

Inspection of granular layer and piping

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

SCHEDULED
LATERAL BRACING & SHEATHING

All nailing and blocking associated with braced wall panels to be completed for this inspection. Wood-based interior braced wall panels to be sheathed. Exterior braced wall panel locations to be clearly marked out on the interior and exterior. Interior braced wall panels to be clearly marked so their location can be seen now and later at the time of INTERIOR BRACED WALL PANEL INSPECTION. Additional anchor bolts shall be installed two per braced wall panel where a building contains framed walls supporting more than two floors.

PASSED
INTERIOR BRACED WALL PANELS

The location of interior braced wall panels to be clearly indicated. This inspection is to take place prior to the installation of tape and joint compound.

PASSED
Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.