BP130541 - 12 University Crescent (Parent Property: 900 Fifth Street) (Phase 2)
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP130541 - 12 University Crescent (Parent Property: 900 Fifth Street) (Phase 2) | |
|---|---|
| Neighbourhood: | University District |
| Street Address: | 12 University Crescent (Parent Property: 900 Fifth Street) (Phase 2) |
| Type of Application: | Commercial / Multi / Industrial |
| File Number: | BP130541 |
| Date Application Submitted: | January 13, 2025 |
| Application Description: |
Certified Professional Building Permit Process - Phase 2: Complete remainder of building floors 4 through to 10 for occupancy New construction of a 10 storey student residential housing building. Building Classification Group C 3.2.2.48-EMTC with Group C and Group A2 major occupancies and with subsidiary Group D, Group F-2 and Group F-3 occupancies. Building area 1059.58 m2. Sprinklered with Fire alarm system. Key FRR/FS: 2Hr non-combustible at stair/elev/shaft and other spaces, 2hr non-combustible floor at levels 1-4. 2hr EMTC at floor levels 5 -10. 1hr at bedroom suites and corridors. Total GFA = 10,035.77m2. Alternative Solutions for: Interconnected floors at level 2 and 3, Exit exposure protection at NW stair, Cafeteria exit and stair 3 exit path, Use of EMTC construction, Combustible piping at geo-exchange energy system, Omission of smoke dampers at residential floors, Slab by-pass curtain wall panel and Combustible exterior soffit on level 3. |
| Application Status: | ACTIVE |
| Permit Value: | $55,868,506.00 |
| Builder: | KINETIC CONSTRUCTION LTD |
| Issued Date: | April 23, 2025 |
| Expiry Date: | April 23, 2027 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 900 FIFTH STREET | , , CS1 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
|
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
MONITORED |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)