BP130513 - 130-301 Lambert Avenue (All Little Bears Daycare) (Parent: 300 Howard Avenue)

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP130513 - 130-301 Lambert Avenue (All Little Bears Daycare) (Parent: 300 Howard Avenue)
Neighbourhood: University District    
Street Address: 130-301 Lambert Avenue (All Little Bears Daycare) (Parent: 300 Howard Avenue)
Type of Application: Commercial / Multi-Res Alteration
File Number: BP130513
Date Application Submitted: December 13, 2024
Application Description: Alteration, Unit 130 (All Little Bears Daycare) Group A2, 456m2 floor area for first tenant to construct a new daycare space within this existing commercial shell unit. Add 2 universal washrooms, 2 additional 4 stall washrooms, 11 sinks, 2 washers,1 HWT, sprinkler changes. Occupant Load: Max: 81 persons

Exist bldg: 2018 BCBC 4 storey, 97 unit apartment bldg. Group C 3.2.2.50, Group A2 3.2.2.24 (Shell only), 1731 m2 bldg area, Sprinklered with Fire Alarm System. Key FRR/FS are 1 Hour FRR/FS 50 STC between residential suites and 55 STC between residential suites and elevators. 1 Hour FRR/FS for public corridor, floor/roof assemblies and loadbearing supports, storage rooms, exit stairs and machine room. 2 hour FRR/FS 55 STC between residential suites and Group A2 and 1.5 hour FRR/FS between Parking Garage and residential units.
REVISION: 2025-MAY-27: See dwgs. for full description
REVISION 2025-SEP-15: Minor layout changes, 2 sprinkler heads added.
Application Status: COMPLETED
Permit Value: $150,000.00
Builder: STF CONTRACTING INC
Issued Date: April 07, 2025
File Close Date: September 19, 2025
Expiry Date: April 07, 2027

Associated Properties

Address Zone More
300 HOWARD AVENUE COR2 Property Report

Process Steps

Task Status
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

PARTIAL
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

PASSED
UNDERSLAB INSULATION

Inspection required prior to placing slab concrete.

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

FAILED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

PARTIAL
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

PASSED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PASSED
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PASSED
SPRINKLER FINAL

Sprinkler system must be complete and operating as intended.

FAILED
SPRINKLER FINAL

Sprinkler system must be complete and operating as intended.

PASSED
PLUMBING FINAL

All fixtures must be in place.

FAILED
PLUMBING FINAL

All fixtures must be in place.

PASSED
APPROVAL-VIHA

Approval required prior to Occupancy

APPROVED
OCCUPANCY FAILED
OCCUPANCY PASSED

2025-09-19

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.