BP130496 - 5957 Tweedsmuir Crescent
Neighbourhood: Rutherford    
Street Address: 5957 Tweedsmuir Crescent
Type of Application: Single / Two Family Alteration
File Number: BP130496
Date Application Submitted: December 11, 2024
Application Description: Second floor addition with new master bedroom and en-suite. Kitchen layout changed, laundry room relocated upstairs to previous upstairs bathroom location, office and storage room created upstairs in the previous location of the master bedroom.

2025-NOV-20 REVISION: Change roof height of addition, main floor-leave existing sliding door and reduce window size at rear, remove closet from garage, replace front entry door. Upper floor- reduce shower stall in en-suite, change en-suite wall to 2x6 framing for plumbing, move bedroom door to top of the stairs, change closets in bedrooms to open alcove style closet, walk in closet and office changed to 8 feet wide to widen the stairs, remove sun tunnels.
Application Status: ACTIVE
Permit Value: $315,000.00
Building Area: 458.03 M2
4,930.19 ft2
Builder: MOMENTUM DESIGN BUILD INC
Issued Date: January 23, 2025
Expiry Date: January 25, 2027

Associated Properties

Address Zone More
5957 TWEEDSMUIR CRESCENT R5 Property Report

Process Steps

Task Status
ROUGH IN PLUMBING

Rough In plumbing must be complete including water piping.

PARTIAL
ROUGH IN PLUMBING

Rough In plumbing must be complete including water piping.

PASSED
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

PARTIAL
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

FAILED
FRAMING

Rough in plumbing & electrical must be complete.

CANCELLED
FRAMING

Rough in plumbing & electrical must be complete.

PASSED
INSULATION

Insulation and vapour barrier to be complete prior to inspection

FAILED
INSULATION

Insulation and vapour barrier to be complete prior to inspection

PASSED
Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.