BP130486 - 24 Strickland Street

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP130486 - 24 Strickland Street
Neighbourhood: South End    
Street Address: 24 Strickland Street
Type of Application: Single / Two Family Alteration
File Number: BP130486
Date Application Submitted: January 13, 2025
Application Description: Construct addition to create legal secondary suite

2025-AUG-18 REVISION: Location of deck stairs changed, parking orientation changed, patio door and window on balcony changed, suite entry door swing changed, upper level floor framing changed, kitchen layout in suite changed, door between main dwelling and suite removed, laundry added to suite, bedroom and bathroom in upper level layout changed.

2025-MAY-01 REVISION: Adding a Geotechnical Engineer to the permit.
Application Status: ACTIVE
Permit Value: $200,000.00
Building Area: 87.15 M2
938.07 ft2
Builder: BUTLER WILSON QUALITY CONSTRUCTION LTD
Issued Date: March 27, 2025
Expiry Date: March 27, 2027

Associated Properties

Address Zone More
24 STRICKLAND STREET R5 Property Report

Process Steps

Task Status
EXCAVATION

Excavation of soil, prior to placing forms.

CANCELLED
FOOTING/FORMS

Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PARTIAL
FOOTING/FORMS

Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PASSED
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PARTIAL
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PASSED
UNDERSLAB PLUMBING

Complete underslab plumbing must be visible

PARTIAL
UNDERSLAB PLUMBING

Complete underslab plumbing must be visible

PASSED
UNDERSLAB INSULATION

Inspection required prior to placing slab concrete.

PASSED
SANITARY CONNECTION

Pipe and Connection must be visible for inspection

PARTIAL
SANITARY CONNECTION

Pipe and Connection must be visible for inspection

PASSED
UNDERSLAB RADON

Inspection of granular layer and piping

FAILED
UNDERSLAB RADON

Inspection of granular layer and piping

PASSED
ROUGH IN PLUMBING

Rough In plumbing must be complete including water piping.

PARTIAL
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

FAILED
ROUGH IN PLUMBING

Rough In plumbing must be complete including water piping.

PASSED
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete.

FAILED
FRAMING

Rough in plumbing & electrical must be complete.

PASSED
Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.