BP130415 - 325 Tenth Street (Waste Connections - 333 Tenth Street Parent Property)
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP130415 - 325 Tenth Street (Waste Connections - 333 Tenth Street Parent Property) | |
|---|---|
| Neighbourhood: | Harewood |
| Street Address: | 325 Tenth Street (Waste Connections - 333 Tenth Street Parent Property) |
| Type of Application: | Commercial / Multi / Industrial |
| File Number: | BP130415 |
| Date Application Submitted: | September 27, 2024 |
| Application Description: |
ALIAS 325 Tenth Street, (Waste Connections) Construction of a one-storey steel arch frame structure measuring 21.95m x 14.6m (321 m2) anchored to concrete lock blocks with a fabric roof covering (CSA S-367-12). Building Classification: BCBC 2024, Part 9 building (Group F2), sprinklered to NFPA 13. |
| Application Status: | COMPLETED |
| Permit Value: | $160,000.00 |
| Issued Date: | March 26, 2025 |
| File Close Date: | August 20, 2025 |
| Expiry Date: | March 26, 2027 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 333 TENTH STREET | I2 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
CANCELLED |
|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
CANCELLED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
|
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
CANCELLED |
|
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
PASSED |
| OCCUPANCY | CANCELLED |
| OCCUPANCY | FAILED |
| OCCUPANCY |
PASSED
2025-08-20 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)