BP130379 - 6700 Island Highway (Costco - locker room remodel)
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP130379 - 6700 Island Highway (Costco - locker room remodel) | |
|---|---|
| Neighbourhood: | Dover |
| Street Address: | 6700 Island Highway (Costco - locker room remodel) |
| Type of Application: | Commercial / Multi-Res Alteration |
| File Number: | BP130379 |
| Date Application Submitted: | September 16, 2024 |
| Application Description: |
Costco - (Group E) 84.1 m2 remodel of the ground floor locker room, addition of a staircase and 76.6 m2 mezzanine, adding sink. Building Classification 2006 BCBC: 3.2.2.57, Group E, sprinkler, fire alarm, non-combustible construction, Building area 11,194 m2 May 29/25 - Revision: mezzanine size increased to 78 m2, stairs moved, payroll room added, changes to structural, mechanical, and electrical drawings |
| Application Status: | COMPLETED |
| Permit Value: | $627,700.00 |
| Builder: | ROJO CONSTRUCTION |
| Issued Date: | March 24, 2025 |
| File Close Date: | September 17, 2025 |
| Expiry Date: | March 24, 2027 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 6700 ISLAND HIGHWAY N | CC4 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PARTIAL |
|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PASSED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
|
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
FAILED |
|
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
PASSED |
|
PLUMBING FINAL
All fixtures must be in place. |
FAILED |
|
PLUMBING FINAL
All fixtures must be in place. |
PASSED |
|
FINAL
Final approval as per requirements on plans. |
CANCELLED |
|
FINAL
Final approval as per requirements on plans. |
PASSED
2025-09-17 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)