BP130345 - 3819 Sundown Drive
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP130345 - 3819 Sundown Drive | |
---|---|
Neighbourhood: | Hammond Bay |
Street Address: | 3819 Sundown Drive |
Type of Application: | Fire Damage |
File Number: | BP130345 |
Date Application Submitted: | October 25, 2024 |
Application Description: |
Repair fire damage to floor structure, stair case and partition walls of existing home, new plumbing, mechanical and insulation throughout, demolish carport 2025-MAY-21 REVISION: Bar sink added to kitchen, mechanical room changed to den and storage room changed to mechanical room. 2025-MAR-17 REVISION: Addition of front porch, structural engineer added to project, foundations added, framing repairs added to exterior deck, framing repairs to various floor and roof areas, reconfigure interior stair layout, add laundry room lower floor and change shower to tub, upper floor en-suite layout revised with walk-in closet changes and new kitchen layout. |
Application Status: | ACTIVE |
Permit Value: | $500,000.00 |
Builder: | EYE FOR DETAIL CONSTRUCTION LTD |
Issued Date: | December 05, 2024 |
Expiry Date: | December 05, 2026 |
Associated Properties
Address | Zone | More |
---|---|---|
3819 SUNDOWN DRIVE | R5 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City Stamp) must be on site. |
PARTIAL |
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City Stamp) must be on site. |
PARTIAL |
ROUGH IN PLUMBING
Pipe and connection must be visable for inspection. |
PARTIAL |
ROUGH IN PLUMBING
Pipe and connection must be visable for inspection. |
FAILED |
ROUGH IN PLUMBING
Pipe and connection must be visable for inspection. |
PARTIAL |
ROUGH IN PLUMBING
Pipe and connection must be visable for inspection. |
PASSED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
FRAMING
Rough-in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
FAILED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
CANCELLED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.