File Number: BP130309
Date Application Submitted: September 03, 2024
Application Description: (Fresh Slice) Leasehold improvement for take out pizza. Renovating all areas of existing 26.5 m2 Unit 7. Addition of two dry sprinkler heads inside walk-in cooler and freezer, two new IT sprinkler heads FOH, removal and replacement of one sprinkler head BOH; addition of one mop sink, one 3-compartment sink, one hand wash sink and grease interceptor.

2024-NOV-18 REVISION: Add HWT, revise domestic and DWV piping.

Building Classification (BP111599/BP113554): BCBC 2006 3.2.2.26. Group A2, ~3100m2 building area, one storey, sprinklered, with fire alarm, combustible or noncombustible construction. 45-min FRR/FS floors, 45-min FRR mezzanines, 45-min FRR or noncombustible loadbearing assemblies.
Application Status: COMPLETED
Permit Value: $80,000.00
Builder: BOEHM CONSTRUCTION LTD
Issued Date: October 04, 2024
File Close Date: January 10, 2025
Expiry Date: October 04, 2026

Associated Properties

Address Zone More
680 TRANS-CANADA HWY PRC1 , W1 , W2 , W3 Property Report

Process Steps

Task Status
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

FAILED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

FAILED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visible for inspection.

PARTIAL
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visible for inspection.

PASSED
PLUMBING FINAL

All fixtures must be in place.

FAILED
PLUMBING FINAL

All fixtures must be in place.

PASSED
SPRINKLER FINAL

Sprinkler system must be complete and operating as intended.

FAILED
SPRINKLER FINAL

Sprinkler system must be complete and operating as intended.

PASSED
APPROVAL-VIHA

Approval required prior to Occupancy

APPROVED
FINAL

Final Approval as per requirements on plans.

CANCELLED
FINAL

Final Approval as per requirements on plans.

CANCELLED
FINAL

Final Approval as per requirements on plans.

PASSED

2025-01-10

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.