BP130309 - 7-680 Trans Canada Highway (Fresh Slice - Ferry Terminal)
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP130309 - 7-680 Trans Canada Highway (Fresh Slice - Ferry Terminal) | |
|---|---|
| Neighbourhood: | Newcastle/Brechin |
| Street Address: | 7-680 Trans Canada Highway (Fresh Slice - Ferry Terminal) |
| Type of Application: | Leasehold Improvements |
| File Number: | BP130309 |
| Date Application Submitted: | September 03, 2024 |
| Application Description: |
(Fresh Slice) Leasehold improvement for take out pizza. Renovating all areas of existing 26.5 m2 Unit 7. Addition of two dry sprinkler heads inside walk-in cooler and freezer, two new IT sprinkler heads FOH, removal and replacement of one sprinkler head BOH; addition of one mop sink, one 3-compartment sink, one hand wash sink and grease interceptor. 2024-NOV-18 REVISION: Add HWT, revise domestic and DWV piping. Building Classification (BP111599/BP113554): BCBC 2006 3.2.2.26. Group A2, ~3100m2 building area, one storey, sprinklered, with fire alarm, combustible or noncombustible construction. 45-min FRR/FS floors, 45-min FRR mezzanines, 45-min FRR or noncombustible loadbearing assemblies. |
| Application Status: | COMPLETED |
| Permit Value: | $80,000.00 |
| Builder: | BOEHM CONSTRUCTION LTD |
| Issued Date: | October 04, 2024 |
| File Close Date: | January 10, 2025 |
| Expiry Date: | October 04, 2026 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 680 TRANS-CANADA HWY | PRC1 , W1 , W2 , W3 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
FAILED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
FAILED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visible for inspection. |
PARTIAL |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visible for inspection. |
PASSED |
|
PLUMBING FINAL
All fixtures must be in place. |
FAILED |
|
PLUMBING FINAL
All fixtures must be in place. |
PASSED |
|
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
FAILED |
|
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
PASSED |
|
APPROVAL-VIHA
Approval required prior to Occupancy |
APPROVED |
|
FINAL
Final Approval as per requirements on plans. |
CANCELLED |
|
FINAL
Final Approval as per requirements on plans. |
CANCELLED |
|
FINAL
Final Approval as per requirements on plans. |
PASSED
2025-01-10 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)