BP130306 - 2025 Bowen Road (ICCS Warming Center)
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP130306 - 2025 Bowen Road (ICCS Warming Center) | |
|---|---|
| Neighbourhood: | Northfield |
| Street Address: | 2025 Bowen Road (ICCS Warming Center) |
| Type of Application: | Commercial / Multi-Res Alteration |
| File Number: | BP130306 |
| Date Application Submitted: | November 05, 2024 |
| Application Description: |
Restoration to damage caused by sprinkler discharge. Remove and replace interior finish materials to reinstate FRR/FS on main and second level for walls, floors and ceilings, repair fire alarm system Existing Part 3 Building containing A-2, C, D, E Occupancies ( Bakery/Restaurant/Office/Dwelling), total floor area 1524 m2, sprinklered, combustible construction June 25, 2025 - Revision: lower floor (bakery production area) exit door into stairwell and exit sign deleted, travel distance not affected. |
| Application Status: | COMPLETED |
| Permit Value: | $80,000.00 |
| Issued Date: | December 11, 2024 |
| File Close Date: | May 25, 2026 |
| Expiry Date: | December 11, 2026 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 2025 BOWEN ROAD | COR3 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
FAILED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
|
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
MONITORED |
|
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
MONITORED |
|
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
FAILED |
|
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
PASSED |
|
FINAL
Final approval as per requirements on plans. |
CANCELLED |
|
FINAL
Final approval as per requirements on plans. |
PASSED
2026-05-25 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)