BP130054 - 101-1609 Bowen Road
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP130054 - 101-1609 Bowen Road | |
|---|---|
| Neighbourhood: | Northfield |
| Street Address: | 101-1609 Bowen Road |
| Type of Application: | Commercial / Multi-Res Alteration |
| File Number: | BP130054 |
| Date Application Submitted: | May 07, 2024 |
| Application Description: |
Alteration to Unit 101 which revises both first storey units. Unit 101 (previously Unit A): 167.96m2 floor area, Group E. Unit 102 (previously Unit B): 110.91m2 floor area, Group E. Infill framing at both rear exterior double doors with new windows/single width door at rear of Unit 101. Replace existing window with new exterior door at North wall of Unit 102. Remove all existing interior partitions in Unit 101, add three offices, one washroom with shower, toilet, lavatory and relocated HWT, one breakroom with sink and cooktop. Removal of some existing partitions in Unit 102. Existing Building Classification: BCBC 1985 Part 9 Group C/E, 291.25m2 building area, combustible and noncombustible construction, unsprinklered, without fire alarm. 3 Group C dwelling units on second storey, 2 Group E suites on first storey. 45-min FRR/FS (1-hr provided) between Group E suites, 1-hr FRR/FS between Group E and Group C, 45-min FRR/FS between Group C suites. |
| Application Status: | COMPLETED |
| Permit Value: | $38,000.00 |
| Issued Date: | November 14, 2024 |
| File Close Date: | January 21, 2025 |
| Expiry Date: | November 14, 2026 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 1609 BOWEN ROAD | COR3 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PASSED |
|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
FAILED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
|
PLUMBING FINAL
All fixtures must be in place. |
FAILED |
|
PLUMBING FINAL
All fixtures must be in place. |
FAILED |
|
PLUMBING FINAL
All fixtures must be in place. |
PASSED |
|
FINAL
Final approval as per requirements on plans. |
FAILED |
|
FINAL
Final approval as per requirements on plans. |
FAILED |
|
FINAL
Final approval as per requirements on plans. |
PASSED
2025-01-21 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)