BP130043 - 1083 Strathmore Street

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP130043 - 1083 Strathmore Street
Neighbourhood: Townsite    
Street Address: 1083 Strathmore Street
Type of Application: Single / Two Family Alteration
File Number: BP130043
Date Application Submitted: May 08, 2024
Application Description: Interior alteration to add a second bedroom, powder room and office to a portion of the lower storey in this existing single family dwelling.

2024-OCT-09 REVISION: Portion of crawlspace to be re-constructed.
Application Status: COMPLETED
Permit Value: $82,000.00
Builder: B GALLANT HOMES LTD
Issued Date: June 26, 2024
File Close Date: November 22, 2024
Expiry Date: June 26, 2026

Associated Properties

Address Zone More
1083 STRATHMORE STREET R5 Property Report

Process Steps

Task Status
UNDERSLAB PLUMBING

Complete underslab plumbing must be visible

PASSED
ROUGH IN PLUMBING

Rough In plumbing must be complete including water piping.

PASSED
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

PARTIAL
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

PASSED
LATERAL BRACING & SHEATHING

All nailing and blocking associated with braced wall panels to be completed for this inspection. Wood-based interior braced wall panels to be sheathed. Exterior braced wall panel locations to be clearly marked out on the interior and exterior. Interior braced wall panels to be clearly marked so their location can be seen now and later at the time of INTERIOR BRACED WALL PANEL INSPECTION. Additional anchor bolts shall be installed two per braced wall panel where a building contains framed walls supporting more than two floors.

PASSED
FRAMING

Rough in plumbing & electrical must be complete.

FAILED
FRAMING

Rough in plumbing & electrical must be complete.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete.

PASSED
INSULATION

Insulation and vapour barrier to be complete prior to inspection

PASSED
FINAL

Final approval as per requirements on plans.

PASSED

2024-11-22

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.