BP130038 - 1694 King John Way
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP130038 - 1694 King John Way | |
|---|---|
| Neighbourhood: | Linley Valley |
| Street Address: | 1694 King John Way |
| Type of Application: | Single / Two Family Alteration |
| File Number: | BP130038 |
| Date Application Submitted: | April 28, 2024 |
| Application Description: |
Interior and exterior alteration of the first storey (slab-on-grade) in this existing 3-storey single family dwelling for the construction of a new two-bedroom legal secondary suite in a portion of the first storey and the remaining floor space being dedicated to the principal dwelling. Scope of work includes new plumbing fixtures, entry door and glazed openings. 2024-DEC-11 REVISION: Changed layout of interior walls, moved shower units and vanity 2025-APR-08 REVISION: Changed window size 2025-APR-23 REVISION: Remove exterior door from main dwelling basement to side yard access. |
| Application Status: | ACTIVE |
| Permit Value: | $58,324.40 |
| Issued Date: | July 16, 2024 |
| Expiry Date: | July 16, 2026 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 1694 KING JOHN WAY | R5 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
PARTIAL |
|
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
SCHEDULED |
|
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete. |
PASSED |
|
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
PARTIAL |
|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
SCHEDULED |
|
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
SCHEDULED |
|
FRAMING
Rough in plumbing & electrical must be complete. |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
FAILED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PASSED |
|
FINAL
Final approval as per requirements on plans. |
SCHEDULED |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)