BP130025 - 124 Haida Trail
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP130025 - 124 Haida Trail | |
|---|---|
| Neighbourhood: | Departure Bay |
| Street Address: | 124 Haida Trail |
| Type of Application: | Single / Two Family Alteration |
| File Number: | BP130025 |
| Date Application Submitted: | September 19, 2024 |
| Application Description: |
Enclose rear deck as conditioned storage space, build roof over deck, exterior stairs and increase common laundry area REVISION 2025-AUG-19: Door swing change, added suite entrance, beam layout changed. |
| Application Status: | ACTIVE |
| Permit Value: | $104,538.57 |
| Building Area: |
32.79 M2 352.95 ft2 |
| Issued Date: | February 18, 2025 |
| Expiry Date: | February 18, 2027 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 124 HAIDA TRAIL | R5 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
EXCAVATION
Excavation of soil, prior to placing forms. |
PARTIAL |
|
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
|
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete. |
PASSED |
|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
|
LATERAL BRACING & SHEATHING
All nailing and blocking associated with braced wall panels to be completed for this inspection. Wood-based interior braced wall panels to be sheathed. Exterior braced wall panel locations to be clearly marked out on the interior and exterior. Interior braced wall panels to be clearly marked so their location can be seen now and later at the time of INTERIOR BRACED WALL PANEL INSPECTION. Additional anchor bolts shall be installed two per braced wall panel where a building contains framed walls supporting more than two floors. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. |
FAILED |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)