Application Description: |
Interior repair for Treatment Centre, remediation for water damage from sprinkler system, work includes new insulation, vapour barrier, GWB, repairing FRR/FS Existing Part 3, sprinklered, fire alarm system, 2 storey, combustible construction, Group C, Building Re-Classification: 3.2.2.45., Corridors 1 hr. FRR/FS, doors opening into the corridor to be 45 min FPR with self closing devices, 1 hr. FRR/FS/ 50 STM between sleeping room and other occupancies. Doors of 20 min FPR/self closing, for sleeping rooms only that open into the public corridor. All other doors opening into the public corridor = 45 min. FPR with self closing devices. |
Application Status: | COMPLETED |
Permit Value: | $250,000.00 |
Issued Date: | June 25, 2024 |
File Close Date: | September 12, 2024 |
Expiry Date: | June 25, 2026 |
Associated Properties
Address | Zone | More |
---|---|---|
2121 BOXWOOD ROAD | CS1 | Property Report |
Process Steps
Task | Status |
---|---|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
FAILED |
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
PASSED |
PLUMBING FINAL
All fixtures must be in place. |
PASSED |
FINAL
Final approval as per requirements on plans. |
FAILED |
FINAL
Final approval as per requirements on plans. |
PASSED
2024-09-12 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.